04/11/2021
"Assist System" means a system that creates a vacuum to assist the movement of vapors back into the storage tank.
"Balance System" means a system where pressure develops in the vehicle tank during fueling operations, and vacuum in the storage tank created when the fuel is removed, forces displaced vapors out the vehicle tank.
"Day" means a calendar day. However, when used to determine when a required document is due and the day falls on a weekend or holiday, the document may be submitted on the first working Day after the weekend or holiday.
"Monthly" means, when describing a compliance requirement, every 30 days or at least once each calendar month.
"Monthly Throughput" means the total volume of gasoline dispensed from all the gasoline storage tanks located at a single affected GDF in a calendar month.
"Pressure/Vacuum Valve" or "P/V Valve" means a relief valve installed on the vent stack of a tank system that is designed to open at specific pressure and vacuum settings to protect the system from excessive pressure or vacuum.
"Tank System" means a storage tank or a set of manifolded storage tanks containing gasoline at a gas dispensing facility.
"Ullage" means the empty volume of a gasoline storage tank system that contains liquid gasoline. Ullage is expressed as accumulated gallons of empty volume for all of the gasoline storage tanks in a manifolded system.
The following lists of California Air Resources Board (CARB) executive orders (EOs) are hereby adopted by reference. In the lists, the term "Phase I" is equivalent to the term "Stage I," and the term "Phase II" is equivalent to the term "Stage II," as used in Section 36.0.
Executive Order Number & Date | Description |
G-70-7-AD (03/22/93) | Certification of the Hasstech Model VCP-2 and VCP 2A Phase II Vapor Recovery System. |
G-70-14-AA (02/08/83) | Recertification of Red Jacket Aspirator Assist Phase II Vapor Recovery System. |
G-70-17-AD (05/06/93) | Modification of Certification of the Emco Wheaton Balance Phase II Vapor Recovery System. |
G-70-18-C (08/28/79) | Modification of Certification of the Shell Model 75B1 and 75B1-R3 Service Station Phase II Vapor Recovery System. |
G-70-23-AC (04/29/96) | Recertification of the Exxon Balance Phase II Vapor Recovery System. |
G-70-25-AA (02/08/83) | Recertification of the Atlantic Richfield Balance Phase II Vapor Recovery System. |
G-70-33-AB (03/09/84) | Certification of the Modified Hirt VCS-200 Vacuum Assist Phase II Vapor Recovery System. |
G-70-36-AD (09/18/92) | Modification of Certification of the OPW Balance Phase II Vapor Recovery System. |
G-70-37-B (01/22/80) | Modification of the Certification of the Chevron Balance Phase II Vapor Recovery System with OPW nozzles for Service. |
G-70-38-AB (12/19/90) | Recertification of the Texaco Balance Phase II Vapor Recovery System. |
G-70-48-AA (02/08/83) | Recertification of the Mobil Oil Balance Phase II Vapor Recovery System. |
G-70-49-AA (02/08/83) | Recertification of the Union Balance Phase II Vapor Recovery System. |
G-70-52-AM (10/04/91) | Certification of Components for Red Jacket, Hirt and Balance Phase II Vapor Recovery System. |
G-70-53-AA (02/08/83) | Recertification of the Chevron Balance Phase II Vapor Recovery System. |
G-70-70-AC (06/23/92) | Certification of the Healy Phase II Vapor Recovery System of Service Stations. |
G-70-77 (09/15/82) | Certification of the OPW Repair/Replacement Parts and Modification of the Certification of the OPW Balance Phase II Vapor Recovery System. |
G-70-78 (05/20/83) | Certification of the E-Z Flo Nozzle Company Rebuilt Vapor Recovery Nozzles and Vapor Recovery Components. |
G-70-101-B (11/15/85) | Certification of the E-Z Flo Model 3006 and 3007 Vapor Recovery Nozzles and Use of E-Z Flo Components with OPW Models 11 VC and 11 VE Vapor Recovery Nozzles. |
G-70-107 (05/15/86) | Certification of Rainbow Petroleum Products Model RA3003, RA3005, RA3006 and RA3007 Vapor Recovery Nozzles and Vapor Recovery Components. |
G-70-110 (01/20/87) | Certification of Stage I and II Vapor Recovery Systems for Methanol Fueling Facilities. |
G-70-118-AB (03/31/95) | Certification of Amoco V-1 Vapor Recovery System. |
G-70-125-AA (03/16/93) | Modification of the Certification of the Husky Model V Phase II Balance Vapor Recovery Nozzle. |
G-70-127 (08/16/90) | Certification of the OPW Model 111-V Phase Vapor Recovery Nozzle. |
G-70-134 (12/21/90) | Certification of the EZ Flo Rebuilt A-4000 Series and 11V-Series Vapor Recovery System. |
G-70-139 (03/17/92) | Addition to the Certification of the Hirt Model VCS-200 Phase II Vapor Recovery System. |
G-70-150-AE (07/12/00) | Modification of the Certification of the Gilbarco Vapor Vac Phase II Vapor Recovery System. |
G-70-153-AD (04/03/00) | Modification to the Certification of the Dresser/Wayne WayneVac Phase II Vapor Recovery System. |
G-70-154-AA (06/10/97) | Modification to the Certification of the Tokheim MaxVac Phase II Vapor Recovery System. |
G-70-159-AB (07/17/95) | Modification of the Certification of the Saber Nozzle for Use with the Gilbarco VaporVac Phase II Vapor Recovery System. |
G-70-163-AA (09/04/96) | Certification of the OPW VaporEZ Phase II Vapor Recovery System. |
G-70-164-AA (12/10/96) | Modification to the Certification of the Hasstech VCP-3A Vacuum Assist Phase II Vapor Recovery System. |
G-70-165 (04/20/95) | Healy Vacuum Assist Phase II Vapor Recovery System. |
G-70-169-AA (08/11/97) | Modification to the Certification of the Franklin Electric INTELLIVAC Phase II Vapor Recovery System. |
G-70-170 (02/22/96) | Certification of the EZ-flo Rebuilt 5005 and 5015 for use with the Balance Phase II Vapor Recovery System. |
G-70-177-AA (06/22/00) | Certification of the VCS400-7 Vacuum Assist Phase II Vapor Recovery System. |
G-70-179 (07/02/97) | Certification of the Catlow ICVN-V1 Vacuum Assist Phase II Vapor Recovery System. |
G-70-180 (04/17/97) | Order Revoking Certification of the Healy Phase II Vapor Recovery Systems for Gasoline Dispensing Systems. |
G-70-183 (03/04/98) | Certification of the Healy/Franklin Vacuum Assist Phase II Vapor Recovery System. |
G-70-186 (10/26/98) | Certification of the Healy Model 400 ORVR Vapor Recovery System. |
G-70-188 (05/18/99) | Certification of the Catlow ICVN Vapor Recovery Nozzle System for use with the Gilbarco VaporVac Vapor Recovery System. |
G-70-191 (08/08/99) | Healy/Franklin VP-1000 Vapor Pump Phase II Vapor Recovery System (Healy ORVR Phase II Vapor Recovery System). |
G-70-196 (12/30/00) | Certification of the Saber Technologies, LLC SaberVac VR Phase II Vapor Recovery System. |
Executive Order Number | Description | Date |
VR-101-T | Phil-Tite Phase I Vapor Recovery System | June 3, 2020 |
VR-102-U | OPW Phase I Vapor Recovery System | June 3, 2020 |
VR-104-K | CNI Manufacturing Phase I Vapor Recovery System | June 3, 2020 |
VR-105-I | EMCO Wheaton Retail Phase I Vapor Recovery | June 3, 2020 |
VR-401-F | OPW Phase I EVR System for ASTs | July 17, 2019 |
VR-402-E | Morrison Brothers Phase I EVR System for ASTs | July 17, 2019 |
7 Del. Admin. Code § 1124-36.0
24 DE Reg. 61 (7/1/2020)
24 DE Reg. 944 (4/1/2021) (Final)