Current through Register Vol. 28, No. 5, November 1, 2024
Section 710-7.0 - BLS Station Construction and Submittal of Plans7.1 The additional station shall be of adequate size to provide space for at least 2 pieces of emergency equipment.7.2 The additional station shall be of fire resistive or non-combustible construction and sprinklered in accordance with all building codes, fire codes and zoning requirements within the local jurisdiction and must provide proper rest room facilities.7.3 The additional station shall be equipped with an emergency power supply to keep the station operational during a power outage.7.4 Preliminary and final plans, specifications, etc., shall be submitted to the Commission for approval along with a copy of the appropriate permits from the county or jurisdictional building department and Fire Marshal's Office before work is started.7.5 A pre-existing building may be approved, provided it meets the standards and requirements set forth in this Section. Preliminary and final plans, along with a copy of the appropriate permits from the county or jurisdictional building department and Fire Marshal's Office, must still be submitted and approved by the Commission.1 Del. Admin. Code § 710-7.0
28 DE Reg. 41 (7/1/2024) (Final)