Current through September 27, 2024
Section 19a-332a-8 - Specific requirements for asbestos encapsulation(a) All loose and hanging ACM shall be adequately wetted and removed as required in Section 19a-332a-7.(b) Filler material applied to gaps in existing material shall contain no asbestos, adhere well to the substrate and provide an adequate base for the encapsulant.(c) Encapsulants shall be applied using only airless spray equipment unless otherwise approved by the Department.Conn. Agencies Regs. § 19a-332a-8
Effective December 27, 1990