Conn. Agencies Regs. § 19-13-B83

Current through June 15, 2024
Section 19-13-B83 - Prerequisite

Water, toilet, handwashing and shower facilities shall be constructed and operational not later than seven days before the first day of the mass gathering. Plans necessary to show full compliance with the requirements of sections 19-13-B81 to 19-13-B96 shall be submitted to the local director of health 30 days in advance of such assembly. The plans shall provide for adequate and satisfactory water supply and sewage facilities, adequate drainage, adequate toilet, handwashing and shower facilities, adequate sleeping areas and facilities, adequate facilities for proper food storage, preparation and service, insect and noxious weed control, adequate refuse storage, collection and disposal facilities, adequate first aid, nursing and medical facilities, and such other matters as may be appropriate for security of life or health.

Conn. Agencies Regs. § 19-13-B83

Effective December 7, 1971