Final inspection of work performed under permit will be made by the applicable District personnel. The purpose of such inspection is to ascertain whether the work has been performed according to the terms of the permit and in a manner satisfactory to the Department. In any case, before the work will be accepted, the traveled way, shoulders, roadside, ditches and other parts of the highway must be placed in as good a condition as before the work was started.
Conn. Agencies Regs. § 13b-17-41