Current through Register Vol. 47, No. 22, November 25, 2024
Section 3 CCR 722-1.7 - The Process Regarding Obtaining an Extension of Time for Participation in an Educational ProgramThe purpose of this Rule is to outline how a student or instructor participating in an educational program can obtain an extension under section 12-235-110(1)(c)(IV), C.R.S.
A resident of another state who does not hold a massage therapy license in Colorado may engage in massage therapy for a limited period of time in this state if:
A. The person is participating as a student or instructor of an educational program that does not exceed sixteen days in duration during any twelve month period; orB. If the program exceeds sixteen days in duration, the person must obtain a grant of an extension from the Director five working days prior to the seventeenth day in accordance with procedures prescribed by the Director.37 CR 11, June 10, 2014, effective 7/1/201438 CR 01, January 10, 2015, effective 1/30/201540 CR 01, January 10, 2017, effective 1/30/201740 CR 19, October 10, 2017, effective 10/30/201743 CR 03, February 10, 2020, effective 1/1/202043 CR 07, April 10, 2020, effective 4/30/202043 CR 22, November 25, 2020, effective 12/15/202044 CR 09, May 10, 2021, effective 5/30/202145 CR 17, September 10, 2022, effective 8/15/202245 CR 16, August 25, 2022, effective 9/14/202245 CR 21, November 10, 2022, effective 11/30/2022