2 Colo. Code Regs. § 601-16-3.00

Current through Register Vol. 47, No. 11, June 10, 2024
Section 2 CCR 601-16-3.00 - Environmental Clearance Required Prior to Issuance of Permit
3.01 The Department shall conduct and prepare an environmental clearance for all areas of the State Highway Right-of-Way for which the Permittee is requesting a Permit.
3.02 In the process of clearing requested parcels, the Department may delineate areas designated as "No Harvesting Allowed" to preclude work or driving equipment through areas that may be Environmentally Restricted Areas. These areas will be delineated and marked by the Department before any Harvesting can take place and all environmental restrictions shall be delineated on the Permit.

2 CCR 601-16-3.00