2 Colo. Code Regs. § 601-10-4.18

Current through Register Vol. 47, No. 11, June 10, 2024
Section 2 CCR 601-10-4.18 - Award of Contract
4.18.1 If the Contract is Awarded, the Award will be made within thirty calendar days after the opening of Bids to the Low Responsible and Responsive Bidder. The Low Responsible and Responsive Bidder must comply with all the requirements and criteria prescribed in the Invitation or Bids, in the rules, and otherwise as provided by law. CDOT will notify the Low Responsible and Responsive Bidder by letter, mailed to the address shown on its Bid, that its Bid has been accepted and that it has been Awarded the Contract.
4.18.2 After the time of Award, all Bids, Bid documents and project documents shall be open or closed to public inspection, as provided in the open records law, Section 24-72-201 et seq., C.R.S.

2 CCR 601-10-4.18

41 CR 17, September 10, 2018, effective 9/30/2018