This Rule sets forth minimum requirements and responsibilities for filing and maintaining performance bonds for surface coal mining and reclamation operations, and coal exploration, in accordance with the Act. The Rule includes minimum requirements for determining the amounts and periods of liability for performance bonds; it establishes minimum standards for the form, conditions and terms of performance bonds; it sets forth minimum provisions for criteria, schedule and procedures for release of performance bonds; it establishes provisions to be applicable whenever a proceeding for the forfeiture of all or any part of a performance bond, as a result of a failure to meet the conditions upon the bond, is initiated; and it sets forth special requirements for construction of certain mine drainage control facilities.
The performance bond will be conditioned upon the faithful performance of all the requirements of the Act, these Rules, the reclamation plan and the permit. The amount, duration, form, conditions, and terms of the performance bond shall conform to 3.02. 113(1),(2),(3)
The amount required for each bonded area shall depend upon the reclamation requirements of the approved permit and shall reflect the probable difficulty of reclamation, giving consideration to such factors as topography, geology of the site, hydrology, and revegetation potential. The amount of the performance bond shall be determined by the Division as part of the decision on permit approval as described in 2.07 and shall be subject to review by the Board as described in 2.07. 113(1), 114
The property subject to the security interest shall not be subject to any conflicting or prior security interest. The instrument creating the interest in real property shall be recorded as authorized for fee interests. In order for the Division to evaluate the adequacy of the property offered to satisfy this requirement, the applicant shall submit a schedule of the real property which will be pledged to secure the obligations under the collateral bond agreement. The schedule shall include:
U.S. and located in the state of Colorado, except that the bank need not be located in the state of Colorado if the letter of credit can be exercised at an affiliate or subsidiary located in the state of Colorado, or is confirmed by a bank located in the state of Colorado, or at the Board's discretion is determined to be an acceptable letter of credit;
The permittee may file a request with the Division for the release of all or part of a performance bond pursuant to the criteria and schedule described in Rule 3.03.1. Prior to filing the request, the permittee shall send written notice of his intention to seek release from bond to adjoining property owners, surface owners, appropriate local government bodies, municipalities, regional planning commissions, boards of county commissioners, county planning agencies, sewage and water treatment authorities, and water conservancy and water conservation districts in the locality in which the surface coal mining operations took place and other governmental agencies as directed by the Division.
Such a request shall include:
Upon receipt of a complete request for the release of a performance bond the Division shall, within thirty (30) days or as soon thereafter as the Division determines weather conditions permit, conduct an inspection and evaluation of the reclamation work involved. Such evaluation shall consider, among other things, the results of inspections and monitoring conducted pursuant to 4.05.13 and 5.02, the degree of difficulty to complete any remaining reclamation, and whether pollution of surface or subsurface water is occurring, the probability of future occurrence of such pollution, and the estimated cost of abating such pollution. The written results of such inspection and evaluation shall be made immediately available for public inspection in the offices of the Division. "As soon thereafter as weather conditions permit" means that the Division must be able to evaluate properly the reclamation operations alleged to have been completed and, therefore, may be subject to seasonal limitations. The surface owner and agent or lessee, if any, shall be given reasonable notice of such inspection, and may participate with the Division in making the inspection. The Division may arrange with the permittee to allow access to the permit area, upon request by any person with an interest in bond release, for the purpose of gathering information relevant to the proceeding. 125(2)
Any person with a valid legal interest which might be adversely affected by release of the bond, or any Federal, State, or local government agency which has jurisdiction by law or special expertise with respect to any environmental, social, or economic impact involved in the operation, or is authorized to develop and enforce environmental standards with respect to such operations, shall have the right to file written objections to or comments upon the requested release from bond and file a request for an informal conference with the Division within thirty (30) days of the last publication of the notice required in (1)(b) above, or within thirty (30) days of the completed inspection, whichever is later. Upon receipt of any such objection or comments, copies thereof shall be transmitted to the permittee.
Without prejudice to the rights of any person who might be adversely affected, the permittee, or the responsibilities of the Division pursuant to this Rule, the Division shall hold an informal conference as provided in 2.07.3(6) to resolve any written comments or objections on the request for release, when such a conference is requested.
The Board shall either: 124(4)
The amount required for each exploration operation shall depend upon the reclamation requirements set forth in the narrative description for exploration involving removal of 250 tons or less of coal as described in 2.02.2(2), or in the exploration and reclamation operation plan for exploration involving removal of more than 250 tons of coal as described in 2.02.3(1), whichever is relevant. This amount shall reflect the probable difficulty of reclamation, giving consideration to such factors as topography, geology of the site, hydrology, and revegetation potential, as applicable.
Liability under the bond(s) applicable to an exploration operation shall be for the duration of that operation, for a period coincident with the responsibilities of 4.21 and 2.02.6, and shall continue until release of the bond(s) in accordance with 3.05.5.
If no request for an adjudicatory hearing as provided in (f) below is received within the specified time period, the proposed decision of the Division shall be final.
The Board shall either:
Performance bond liability shall include construction of impoundments, conveying systems, and treatment facilities for mine drainage planned in accordance with 4.05.2, 4.05.8, and 4.05.10. Bond liability with respect to mine drainage shall extend to the construction and ultimate removal of facilities described in the permit application or reclamation plan as associated with the treatment of mine drainage. The bond amount determination made under 3.02.2 shall not include continuous treatment, monitoring, or potential unpredictable expenses resulting from mine drainage.
Release of bond coverage for the liabilities described in 3.06.1 shall be authorized only after final inspection, acceptance, and approval by the Division, and shall not be subject to the extended liability period of 3.02.3(2) or the bond release criteria of 3.03.1(2). Procedures for seeking bond release shall be conducted in accordance with 3.03.2.
Except to the extent that provisions of other sections of Rule 3 conflict with 3.06, all other portions of Rule 3 shall apply to the mine drainage control facilities subject to Rule 3.06.1.
2 CCR 407-2-3