Section 2 CCR 404-1-423 - NOISEa. Operators will submit a noise mitigation plan that demonstrates one or more proposed methods of meeting the maximum permissible noise levels described by this Rule 423 as an attachment to their Form 2As, as required by Rule 304.c.(2). An Operator may submit substantially equivalent information or plans developed through a Local Government land use process or federal process in lieu of the information required by this Rule 423.a unless the Director or Commission determines that the information or plan developed through the Local Government land use process or federal process is not equivalent. The noise mitigation plan will include at least the following information:(1) An explanation of how the Operator will comply with the maximum permissible noise levels specified in Rule 423.b.(1). This is to include a description of methods to design acoustical mitigation measures or choose/site equipment appropriately such that the Operator has a reasonable expectation of compliance.(2) Estimated duration of each stage of operation, including drilling, completion, Flowback, production, and an estimate of the noise levels of each stage of operation;(3) Reference to topographical considerations of noise and noise propagation at the proposed Oil and Gas Location;(4) Description of Best Management Practices and best engineering practices for measuring and mitigating noise levels and an implementation schedule for such technology.(5) For proposed Oil and Gas Locations with a Working Pad Surface within 2,000 feet of one or more Residential Building Units, at least one, and no more than six noise points of compliance where monitors will be located. Operators will identify noise points of compliance using the following criteria:A. Provide one noise point of compliance in each direction in which a Residential Building Unit is located within 2,000 feet of the proposed Working Pad Surface.B. Noise points of compliance will be located at least 350 feet from the Working Pad Surface, and no less than 25 feet from the exterior wall of the Residential Building Unit that is closest to the Working Pad Surface. If a Surface Owner or tenant refuses to provide the Operator with access to install a noise monitor, then the noise point of compliance will be located at either the next-closest Residential Building Unit or an alternative location approximately the same distance and direction from the Working Pad Surface.b. A preliminary plan for how the Operator will conduct background ambient noise surveys to establish baseline conditions for noise levels on the site, for both A-scale and C-scale noise. The Director may require as a condition of approval on the Form 2A that the Operator conduct the background ambient noise survey between 30 and 90 days prior to start of construction and update the plan accordingly based on the results. Operators will conduct baseline noise surveys at the noise points of compliance identified pursuant to Rule 423.a.(5). When an Operator conducts a background ambient survey the Operator will follow the same approach as outlined in Rule 423.c.(7) and over a 72-hour period, including at least 24 hours between 10:00 p.m. on a Friday and 4:00 a.m. on a Monday. Operators will record any significant weather events and take those events into account when establishing the baseline. A single cumulative daytime ambient noise level and a single cumulative nighttime ambient noise level will be established by taking the logarithmic average of all daytime or nighttime 1-hour Leq values measured and in accordance with the sound level data collection requirements pursuant to the maximum permissible noise levels.(1) All Oil and Gas Operations will comply with the following maximum permissible noise levels in Table 423-1 unless otherwise required by Rule 423. The Director may require Operators to comply with a lower maximum permissible noise level based on the consultation process with Relevant and Proximate Local Governments, CDPHE, or CPW pursuant to Rules 302.g, 309.e, & 309.f. Table 423-1 - Maximum Permissible Noise Levels
LAND USE DESIGNATION | 7:00 am to next 7:00 pm | 7:00 pm to next 7:00 am |
Residential/ Rural/State Parks & State Wildlife Areas | 55 db(A) | 50 db(A) |
Commercial/Agricultural | 60 db(A) | 55 db(A) |
Light Industrial | 70 db(A) | 65 db(A) |
Industrial | 80 db(A) | 75 db(A) |
All Zones | 60 db(C) | 60 db(C) |
(2) Unless otherwise required by Rule 423, drilling or completion operations, including Flowback: A. In Residential/Rural or Commercial/Agricultural, maximum permissible noise levels will be 60 db(A) in the hours between 7:00 p.m. to 7:00 a.m. and 65 db(A) in the hours between 7:00 a.m. to 7:00 p.m.; andB. In all zones maximum permissible noise levels will be 65 db(C) in the hours between 7:00 p.m. to 7:00 a.m. and 65 db(C) in the hours between 7:00 a.m. to 7:00 p.m.(3) The basis for determining land use designation pursuant to Table 423-1 will be the Relevant Local Government's land use or zoning designation. The Director may consult with a Relevant or Proximate Local Government to identify the type of land use of the Oil and Gas Location and its surrounding area, taking into consideration any applicable zoning or other local land use designation. A. To protect public health, safety, and welfare, the Director may require Operators to comply with a lower maximum permissible noise level in areas zoned industrial, light industrial, or commercial, if the Oil and Gas Facility will be within 2,000 feet of a Residential Building Unit or High Occupancy Building Unit.B. In a noise mitigation plan submitted pursuant to Rule 423.a, an Operator may request a higher maximum permissible noise level than would otherwise be allowed by Table 423-1, if the Operator demonstrates that both the Relevant and any Proximate Local Governments agree to the higher maximum permissible noise level. The Director may apply that higher maximum permissible noise level as long as the requested level is protective of public health, safety, and welfare, and wildlife.(4) When operating in High Priority Habitat, Operators will consult CPW and, on federal lands, the Bureau of Land Management, or United States Fish and Wildlife Service, to determine the acceptable noise limits and monitoring protocols.(5) Operators may exceed the noise levels in Table 423-1 as measured at the nearest noise point of compliance if all affected Surface Owners and tenants agree in writing to the higher noise limit requested by the Operator.(6) Unless otherwise required by Rule 423.b.(7), during the hours between 7:00 a.m. and the next 7:00 p.m. the maximum permissible noise levels listed in Table 423-1 may be increased 10 dB(A) for a period not to exceed 15 minutes in any 1-hour period. The increase is permissible only for a 1 hour period during any 12 hours.(7) Operators will reduce periodic, impulsive, or shrill noise by 5 dB(A) below the levels in Table 423-1. For periodic, shrill, and impulsive noise within 1000 feet of a Residential Building Unit, Operators will minimize noise that can be readily eliminated through maintenance, equipment modification, or other readily available procedures.(8) Pursuant to Commission inspection or upon receiving a complaint from a Local Government, or a Surface Owner or tenant of a property within 2,000 feet of an Oil and Gas Facility regarding noise related to Oil and Gas Operations, the Commission will conduct an onsite investigation and take sound measurements using the methods prescribed for Operators in Rule 423.c.c. To demonstrate compliance with Tables 423-1 and 423-2 Operators will measure sound levels according to the following standards:(1) During pre-production activities and ongoing operations lasting longer than 24 consecutive hours such as drilling, completion, recompletion, Stimulation, and Well maintenance, in areas zoned residential or within 2,000 feet of a Building Unit, Operators will take continuous sound measurements from each noise point of compliance designated pursuant to Rule 423.a.(5).(2)Monitoring Procedures.A. In response to a complaint or at the Director's request, Operators will measure sound levels at 25 feet from the complainant's occupied structure towards the noise source for low frequency (dbC) indicated issues. For high frequency (dbA) measurement will be at the nearest point of compliance. For equipment installed at Oil and Gas Locations subject to a Form 2A approved prior to January 15, 2021, after the Commencement of Production Operations, no single piece of equipment will exceed the maximum permissible noise levels listed in Table 423-1 as measured at a point 350 feet from the equipment generating the noise in the direction from which the complaint was received.B. In situations where measurement of noise is unrepresentative due to topography or any other issue, Operators or the Commission may take the measurement at the nearest noise point of compliance, or at a different distance and extrapolate it to 25 feet from the complainant's residence (dbC) or the complainant's property line (dbA) using the following formula: db(A) distance 2 = db(A) distance 1 - 20 x log 10 (distance 2/distance 1)
db(C) distance 2 = db(C) distance 1 - 20 x log 10 (distance 2/distance 1)
(3) Operators will equip sound level meters with wind screens that are in good working order, and will take readings when the wind velocity at the time and place of measurement is not more than 5 miles per hour. In determining an Oil and Gas Operation's contribution to sound levels, the Director will consider wind readings that exceed 5 mph.(4) Operators will take sound level measurements 5 feet above ground level.(5) Operators will determine sound levels by averaging logarithmic minute-by-minute measurements made over a minimum 1-hour sample duration.(6) All sound meters will be type II meters at a minimum. All measurements will be reported using LeqA (fast) and LeqC (slow). Meters will be field calibrated pre-survey and post survey. Continuous surveys will be field calibrated pre-survey and post survey and pursuant to the manufacturer's recommended interval. All survey equipment will be inspected at time of calibration for compliance with the Commission's Rules.(7) Operators will take samples under conditions that are representative of the noise experienced by the complainant (e.g., at night, morning, evening, or during special weather conditions).(8) If a Building Unit, High Occupancy Building Unit, High Priority Habitat, or Designated Outside Activity Area is built or designated after an Oil and Gas Development Plan or Form 2A is approved, the Operator of the Oil and Gas Location need not comply with Rule 423.c with respect to the newly built or designated Building Unit, High Occupancy Building Unit, High Priority Habitat, or Designated Outside Activity Area.(9) Operators will maintain records to demonstrate compliance with this Rule 423.c, and will submit the records to the Director upon request.d.Cumulative Noise. All noise measurements will be cumulative.(1) Noise measurements taken at noise points of compliance designated pursuant to Rule 423.a.(5) will take into account ambient noise, rather than solely the incremental increase of noise from the facility targeted for measurement.(2) At new or substantially modified Oil and Gas Locations where ambient noise levels at noise points of compliance designated pursuant to Rule 423.a.(5) already exceed the noise thresholds identified in Table 423-1, then Operators will be considered in compliance with Rule 423, unless at any time their individual noise contribution, measured pursuant to Rule 423.c, increases noise above ambient levels by greater than 5 dBC and 5 dBA between 7:00 p.m. and 7:00 a.m. or 7 dBC and 7 dBA between 7:00 a.m. and 7:00 p.m. This Rule 423.d.(2) does not allow Operators to increase noise above the maximum cumulative noise thresholds specified in Table 423-2 after the Commencement of Production Operations.(3) After the Commencement of Production Operations, if ambient noise levels already exceed the maximum permissible noise thresholds identified in Table 423-1, under no circumstances will new Oil and Gas Operations or a significant modification to an existing Oil and Gas Operations raise cumulative ambient noise above: Table 423-2 - Maximum Cumulative Noise Levels
LAND USE | 7:00 am to next 7:00 pm | 7:00 pm to next 7:00 am |
Residential /Rural/State Parks/State Wildlife Areas | 65 db(A) | 60 db(A) |
Commercial/Agricultural | 70 db(A) | 65 db(A) |
Light Industrial | 80 db(A) | 75 db(A) |
Industrial | 90 db(A) | 85 db(A) |
All Zones | 75 db(C) | 70 db(C) |
e. If Oil and Gas Operations result in persistent noise that adversely impacts public welfare, the Director may require the Operator to take action pursuant to Rule 901.a.37 CR 16, August 25, 2014, effective 9/30/201438 CR 01, January 10, 2015, effective 2/14/201538 CR 03, February 10, 2015, effective 3/2/201538 CR 07, April 10, 2015, effective 4/30/201538 CR 16, August 25, 2015, effective 9/14/201539 CR 04, February 25, 2016, effective 3/16/201641 CR 05, March 10, 2018, effective 4/1/201841 CR 06, March 25, 2018, effective 5/1/201841 CR 23, December 10, 2018, effective 12/30/201842 CR 02, January 25, 2019, effective 2/14/201942 CR 17, September 10, 2019, effective 9/30/201942 CR 24, December 25, 2019, effective 1/14/202043 CR 17, September 10, 2020, effective 9/30/202043 CR 13, July 10, 2020, effective 11/2/202043 CR 24, December 25, 2020, effective 1/15/202145 CR 07, April 10, 2022, effective 4/30/202245 CR 09, May 10, 2022, effective 5/30/202245 CR 13, July 10, 2022, effective 7/30/2022