2 Colo. Code Regs. § 404-1-407

Current through Register Vol. 47, No. 20, October 25, 2024
Section 2 CCR 404-1-407 - FORM 45, LOCATION CONSTRUCTION REPORT
a.An Operator will submit a Form 45, Location Construction Report within 45 days of completion of interim Reclamation for a new or modified Oil and Gas Location.
b. The Form 45 will include the following information:
(1) Geographic Information System ("GIS") polygon data to describe the as-built boundaries of the entire Oil and Gas Location and of the Working Pad Surface;
(2) A surveyed as-built layout drawing of the Oil and Gas Facilities and Production Facilities, and other temporary and permanent equipment on the location;
(3) A proposed anticipated schedule, by month and year, of the operation phases planned for 1 year following the date the Form 45 is submitted; and
(4) A description of all conductors that have been set, including:
A. Well name and Well number, and API number if the Well has an approved Form 2;
B. Latitude and longitude of the conductor. If Global Positioning System ("GPS") technology is utilized to determine the latitude and longitude, all GPS data will meet the requirements set forth in Rule 216; and
C. Conductor setting depth, pipe description (including diameter and weight/foot, if applicable), cement volume, and cement job summary (if applicable).

2 CCR 404-1-407

37 CR 16, August 25, 2014, effective 9/30/2014
38 CR 01, January 10, 2015, effective 2/14/2015
38 CR 03, February 10, 2015, effective 3/2/2015
38 CR 07, April 10, 2015, effective 4/30/2015
38 CR 16, August 25, 2015, effective 9/14/2015
39 CR 04, February 25, 2016, effective 3/16/2016
41 CR 05, March 10, 2018, effective 4/1/2018
41 CR 06, March 25, 2018, effective 5/1/2018
41 CR 23, December 10, 2018, effective 12/30/2018
42 CR 02, January 25, 2019, effective 2/14/2019
42 CR 17, September 10, 2019, effective 9/30/2019
42 CR 24, December 25, 2019, effective 1/14/2020
43 CR 17, September 10, 2020, effective 9/30/2020
43 CR 13, July 10, 2020, effective 11/2/2020
43 CR 24, December 25, 2020, effective 1/15/2021
45 CR 07, April 10, 2022, effective 4/30/2022
45 CR 09, May 10, 2022, effective 5/30/2022
45 CR 13, July 10, 2022, effective 7/30/2022