Current through Register Vol. 47, No. 20, October 25, 2024
Section 2 CCR 404-1-407 - FORM 45, LOCATION CONSTRUCTION REPORTa.An Operator will submit a Form 45, Location Construction Report within 45 days of completion of interim Reclamation for a new or modified Oil and Gas Location.b. The Form 45 will include the following information: (1) Geographic Information System ("GIS") polygon data to describe the as-built boundaries of the entire Oil and Gas Location and of the Working Pad Surface;(2) A surveyed as-built layout drawing of the Oil and Gas Facilities and Production Facilities, and other temporary and permanent equipment on the location;(3) A proposed anticipated schedule, by month and year, of the operation phases planned for 1 year following the date the Form 45 is submitted; and(4) A description of all conductors that have been set, including: A. Well name and Well number, and API number if the Well has an approved Form 2;B. Latitude and longitude of the conductor. If Global Positioning System ("GPS") technology is utilized to determine the latitude and longitude, all GPS data will meet the requirements set forth in Rule 216; andC. Conductor setting depth, pipe description (including diameter and weight/foot, if applicable), cement volume, and cement job summary (if applicable).37 CR 16, August 25, 2014, effective 9/30/201438 CR 01, January 10, 2015, effective 2/14/201538 CR 03, February 10, 2015, effective 3/2/201538 CR 07, April 10, 2015, effective 4/30/201538 CR 16, August 25, 2015, effective 9/14/201539 CR 04, February 25, 2016, effective 3/16/201641 CR 05, March 10, 2018, effective 4/1/201841 CR 06, March 25, 2018, effective 5/1/201841 CR 23, December 10, 2018, effective 12/30/201842 CR 02, January 25, 2019, effective 2/14/201942 CR 17, September 10, 2019, effective 9/30/201942 CR 24, December 25, 2019, effective 1/14/202043 CR 17, September 10, 2020, effective 9/30/202043 CR 13, July 10, 2020, effective 11/2/202043 CR 24, December 25, 2020, effective 1/15/202145 CR 07, April 10, 2022, effective 4/30/202245 CR 09, May 10, 2022, effective 5/30/202245 CR 13, July 10, 2022, effective 7/30/2022