Current through Register Vol. 47, No. 23, December 10, 2024
Section 7 CCR 1101-16-4-1 - Delivery(a) No owner/operator of a retail natural gas fueling facility shall allow natural gas to be delivered into the following: (1) An improperly installed container assembly or piping system installed at a natural gas fueling facility.(2) A container installed at a natural gas fueling facility that does not have a proper ASME nameplate.41 CR 16, August 25, 2018, effective 9/15/2018