6 Colo. Code Regs. § 1011-1-2.2

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1011-1-2.2 - General Building and Fire Safety Provisions
2.2.1 The BHE shall comply with 6 CCR 1011-1, Chapter 2, Part 3, General Building and Fire Safety Provisions, with the following additions:
(A) From July 1, 2021 through June 30, 2022, the transition to a BHE license by an entity licensed pursuant to 6 CCR 1011-1, Chapter 2, 6 CCR 1011-1, Chapter 6, or 6 CCR 1011-1, Chapter 9 as a community mental health center, community mental health clinic, crisis stabilization unit, or acute treatment unit shall not trigger a Facility Guidelines Institute (FGI) compliance review.
(B) An initial BHE license for an entity which, prior to July 1, 2021, was not previously licensed pursuant to 6 CCR 1011-1, Chapter 2, 6 CCR 1011-1, Chapter 6, or 6 CCR 1011-1, Chapter 9 as a community mental health center, community mental health clinic, crisis stabilization unit, or acute treatment unit shall be subject to FGI compliance review in accordance with 6 CCR 1011-1, Chapter 2, Part 3.
(C) The following actions shall trigger an FGI compliance review of the relevant building or space:
(1) New construction or renovation, in accordance with 6 CCR 1011-1, Chapter 2, Part 3.3.
(2) The addition of a new endorsement.
(3) The addition of a new physical location.
(4) The addition of new service types to a physical location already included in the license.
(D) Compliance with FGI standards in accordance with 6 CCR 1011-1, Chapter 2, Part 3.2.3 is not required for a physical location in which no client services are provided. The BHE shall ensure such locations comply with 6 CCR 1011-1, Chapter 2, Part 3.2.1.
(E) The BHE shall meet the endorsement-specific and/or service-specific building and fire-safety provisions found in this Chapter, for physical locations in which client services are provided, as applicable.
(F) The BHE shall provide an interior environment that is clean and sanitary, appropriately maintained and in good repair, and free of hazards to health and safety.
(G) The BHE shall ensure the prominent posting of evacuation routes and exits in each physical location.
(H) The BHE shall prominently post the hours of operation at the entrance of each physical location.

6 CCR 1011-1-2.2