6 Colo. Code Regs. § 1007-3-8.51

Current through Register Vol. 47, No. 20, October 25, 2024
Section 6 CCR 1007-3-8.51 - Basis and Purpose

These amendments to 6 CCR 1007-2, Part 3 are made pursuant to the authority granted to the Hazardous Waste Commission in § 25-15-302(2), C.R.S.

Inspection of Off-Site Hazardous Waste Disposal Sites

These amendments to 6 CCR 1007-2, Part 3 revise the inspection frequency for the Department's inspection of off-site hazardous waste disposal sites. As specified in Section 25-15-209.5, C.R.S., such inspection shall be conducted at intervals determined by rule and regulation of the commission based on the volume and toxicity of the wastes being received. The State's only hazardous waste disposal facility is the Clean Harbors Deer Trail LLC facility (formerly Highway 36 Land Development Company.) This facility, in a meeting on February 6, 2003 and in a letter of March 4, 2003, has notified the Department of its intent to significantly reduce its hazardous waste treatment and disposal activities for the near future.

The existing regulations require the Department to conduct inspections of off-site hazardous waste disposal sites a minimum of four (4) times per month. These amendments, which tie the Department's inspection frequency more closely to the volume of wastes received, replace the existing inspection frequency with the following inspection schedule: a minimum of once per month when waste receipts are less than 500 tons per month; a minimum of twice per month when waste receipts are between 500 tons and 1000 tons per month; and a minimum of four (4) times a month when waste receipts are greater than 1000 tons per month. The Department will continue to inspect the facility more frequently if the type of wastes received, the compliance history of the facility, or findings of previous inspections warrant a greater frequency.

Statement of Basis and Purpose - Rulemaking Hearing of June 17, 2003

6 CCR 1007-3-8.51

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023