Current through Register Vol. 47, No. 20, October 25, 2024
Section 6 CCR 1007-3-100.2.21 - PERMITS BY RULEThe following shall be deemed to have a State RCRA permit and need not apply to the Department if the conditions listed are met:
(b)Injection wells. The owner or operator of an injection well disposing of hazardous waste, if the owner or operator:(1) Has a permit for underground injection issued under 40 CFR Part 122 , Subpart C or 40 CFR Part 123 , Subpart C; and(2) Complies with the conditions of that permit and the requirements of 40 CFR § 122.45 (requirements for wells managing hazardous waste).(3) For UIC permits issued after November 8,1984:(i) Complies with § 264.101 of these regulations and(ii) Where the UIC well is the only unit at a facility which requires a RCRA permit, complies with 40 CFR § 270.14(d). (c)Publicly owned treatment works. The owner or operator of a POTW which accepts for treatment hazardous waste, if the owner or operator: (2) Complies with the conditions of that permit; and(3) Complies with the following regulations:(i) Colorado Part 264.11, Identification number;(ii) Colorado Part 264.71, Use of manifest system;(iii) Colorado Part 264.72, Manifest discrepancies;(iv) Colorado Part 264.73(a) and (b)(1), Operating record;(v) Colorado Part 264.75, Biennial reports;(vi) Colorado Part 264.76, Unmanifested waste report; and(vii) For NPDES permits issued after Nov. 8,1984, Colorado Part 264.101(4) If the waste meets all Federal, state, and local pretreatment requirements which would be applicable to the waste if it were being discharged into the POTW through a sewer, pipe, or similar conveyance.(d)Generator treatment. A generator performing on-site treatment of its own waste, if the generator:(1) Treats the waste in accumulation tanks or containers;(2) Treats the waste to make it more suitable for recycling or reclamation (on or off-site) or to reduce its volume or toxicity;(3) Complies with the following regulations: (ii) Section 265.13 (Waste Analysis); and(iii) Section 265.17 (General requirements for Ignitable, Reactive, or Incompatible Wastes).(4) Develops a written waste analysis plan describing the procedures that will be carried out to accomplish treatment of the waste. The waste analysis plan must be based on a detailed chemical and physical analysis of a representative sample of the waste being treated and contain all of the information necessary to treat the waste.(5) Thermal treatment of wastes is prohibited.(6) Treatment of reactive waste is prohibited.(e)Corrective Action. The owner or operator of a surface impoundment, waste pile, land treatment unit or landfill established as part of a corrective action management unit pursuant to § 264.551 or 264.552, or a temporary unit pursuant to § 264.553, provided: (1) The corrective action management unit or temporary unit has been designated by and made a part of an order issued by the Department pursuant to § 265.5, or a Corrective Action Plan approved by the Department pursuant to § 100.26; and(2) The public has been provided a period of at least 30 days to comment on the designation of the corrective action management unit or temporary unit. However, where the Department determines that corrective action is necessary to address immediate threats to human health or the environment and a delay in the designation of the corrective action management unit or temporary unit would adversely impact human health or the environment, such public comment period may be reduced or eliminated.37 CR 24, December 25, 2014, effective 3/2/201538 CR 11, June 10, 2015, effective 6/30/201539 CR 05, March 10, 2016, effective 3/30/201639 CR 11, June 10, 2016, effective 6/30/201640 CR 06, March 25, 2017, effective 4/14/201740 CR 11, June 10, 2017, effective 6/30/201740 CR 21, November 10, 2017, effective 11/30/201741 CR 06, March 25, 2018, effective 4/14/201841 CR 11, June 10, 2018, effective 6/30/201841 CR 24, December 25, 2018, effective 1/14/201942 CR 06, March 25, 2019, effective 4/14/201942 CR 06, March 25, 2019, effective 5/30/201942 CR 11, June 10, 2019, effective 6/30/201943 CR 12, June 25, 2020, effective 7/15/202044 CR 06, March 25, 2021, effective 4/14/202144 CR 11, June 10, 2021, effective 6/30/202144 CR 24, December 25, 2021, effective 1/14/202245 CR 11, June 10, 2022, effective 6/30/202245 CR 17, September 10, 2022, effective 9/10/202245 CR 17, September 10, 2022, effective 9/30/202245 CR 23, December 10, 2022, effective 1/30/2023