Tier | Description | Cost |
1 | Projects that incur minimal costs and water quality impacts | $1,122 |
2 | Projects that incur moderate costs and potential water quality impacts | $3,876 |
3 | Projects that involve large watershed area, a high degree of complexity, or a high potential for water quality impacts | Calculated on an hourly rate based on the actual costs of Division staff and contractor time. |
4 | Projects that involve multiple or large watershed areas, a very high degree of complexity, very high potential for water quality impacts, or a high level of public involvement | Calculated on an hourly rate based on the actual costs of Division staff and contractor time. |
The Division can extend the reasonable period of time, upon written notice to the federal permitting agency and applicant, if more time is required to comply with its public notice procedures or if there is a force majeure event (i.e., a natural disaster). This is provided when the extension in either case does not cause the reasonable period of time to exceed the statutory maximum of one (1) year.
5 CCR 1002-82.4