Current through Register Vol. 47, No. 20, October 25, 2024
Section 5 CCR 1002-72.9 - REPORTING1. The Authority shall submit an annual report on the activities required under this regulation to the Commission and Division by March 31 of each year. The report shall include the following categories and items:(a) Point Source Controls: phosphorus concentrations; permit violations; approved site applications; and effectiveness in reducing nutrient contributions.(b) Regulated Stormwater Controls: Sediment and erosion control permit, inspection, and enforcement actions; Construction CMs inspection and enforcement actions; Permanent CMs construction, inspection, and maintenance actions; Flood control facilities retrofitting, inspection, and maintenance actions; Effectiveness in reducing phosphorus concentration; Funding and monitoring of nonpoint source control projects; and Public information and education actions.(c) Nonpoint Source Stormwater Controls: Effectiveness in reducing phosphorus concentration; Funding and monitoring of PRFs.(d) Riparian and Wetlands Protection: Protection, enhancement, and restoration actions.(e) Concentration-based phosphorus control measures: The annual report shall provide data and information on water quality monitoring, point sources, regulated stormwater sources, nonpoint sources, status of compliance with discharge permit limits and conditions, recommendations on any new or proposed expansion of treatment facilities, and recommendations for improving water quality. The format of annual reports and information within the reports shall provide comparability among previous years.2. The annual report shall include evidence of decisions and/or agreements for the financing of nonpoint source control projects, the implementation of the regulated stormwater permit requirements, and the adoption and implementation of CMs by local governments. The annual report must demonstrate implementation of nonpoint source controls and regulated stormwater controls are reducing phosphorus concentrations into the Reservoir to the maximum extent practicable.45 CR 11, June 10, 2022, effective 6/30/2022