Current through Register Vol. 47, No. 20, October 25, 2024
Section 5 CCR 1002-71.6 - CONTROL OF NEW NONPOINT SOURCES(1) The allowed point source phosphorus allocations in section 3 are based on the assumption that Summit County and local governments in Summit County adopt regulations that require best management practices or other methods of phosphorus control which will result in pound for pound mitigation for all new nonpoint sources of phosphorus. If the Division determines that nonpoint source controls are not adequate to prevent exceedance of the phosphorus standard for Dillon Reservoir, the Commission may reconsider the allowed phosphorus allocations in section 3. (2) The Division will report periodically to the Commission and to Summit County Local Governments on the results of any inspections conducted to evaluate nonpoint source controls.