The provisions of sections 25-8-202 and 25-8-401, C.R.S., provide the specific statutory authority for adoption of the attached regulatory amendments. The Commission also adopted, in compliance with section 24-4-103(4) C.R.S., the following statement of basis and purpose.
BASIS AND PURPOSE
The Commission on January 17, 1997 convened a Informational Hearing for the triennial review of the Colorado Discharge Permit System Regulations, 5 CCR 1002-61. The single modification identified at the Informational Hearing pertained to the reference to the Code of Federal Regulations (CFR) which appears at section 61.1 of the regulations. That section is amended to reference the current CFR.
Additional changes have been made at several locations within the regulations to either correct typographical errors or inconsistencies in the format.
5 CCR 1002-61.45