5 Colo. Code Regs. § 1002-52.4

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-52.4 - INTENDED USE PLAN

The Division, in cooperation with the Division of Local Government (DLG) and the Authority, shall develop an annual IUP.

The IUP shall include:

(1) The Project Eligibility List and Projected Loan List of projects.
(2) Descriptions of:
(a) Criteria and method used for distribution of funds
(b) Financial status of the DWRF program
(c) Short and long term goals of the DWRF program
(d) Amounts transferred between the DWRF and the Water Pollution Control Revolving Fund
(e) Set-aside activities and the percentage of the capitalization grant to be used
(f) How a state disadvantaged community program will be defined and utilized, if applicable.
(3) Any other material that may be required by the SDWA.

5 CCR 1002-52.4

38 CR 17, September 10, 2015, effective 9/30/2015