5 Colo. Code Regs. § 1002-52.13

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-52.13 - STATEMENT OF BASIS, SPECIFIC STATUTORY AUTHORITY AND PURPOSE (MARCH 9, 2009 RULEMAKING; EFFECTIVE DATE APRIL 30, 2009)

Sections 25-8-202(1)(g) and (o); and Section 37-95-107.8(4), C.R.S. provide the specific statutory authority for adoption of the attached regulatory amendments. The Commission also adopted, in compliance with section 24-4-103(4) C.R.S. the following statement of basis and purpose.

BASIS AND PURPOSE

The Commission conducted this rulemaking hearing to add a sixth category of projects for inclusion on the Drinking Water Revolving Fund Project Eligibility List. The addition of this category will ensure that Colorado will be able to use all funds that may become available under the American Recovery and Reinvestment Act of 2009 (ARRA). Projects added to the existing 2009 Project Eligibility list will receive funding only if necessary to fully utilize existing loan capacity and new federal funding that may become available in 2009. Consistent with the existing structure for prioritization, Category 6 projects will only be considered for funding after all other projects designated under Categories 1-5 have been given an opportunity to proceed. Category 6 projects will be subject to the eligibility requirements and intra-category ranking system outlined in Section 52.6 of this regulation.

The Commission intends that terms and conditions specific to the administration of grant monies received under the ARRA will be memorialized in an addendum to the 2009 Drinking Water Revolving Fund and State Drinking Water Grant Fund Intended Use Plan (IUP). Such terms and conditions may include additional criteria for funding eligibility and priority ranking to comply with the requirements of the ARRA and to maintain consistency with EPA's final ARRA guidance document. Interim deadlines or milestones to ensure that projects are proceeding expeditiously to meet the 12-month deadline in the ARRA may also be included in the IUP Addendum. To the extent that any of the terms and conditions in the IUP Addendum may differ from the original 2009 IUP or these Regulations, the Commission intends that the provisions of the IUP Addendum will govern with respect to the details of administering ARRA funds among the six funding categories. The Commission will utilize its administrative action hearing process, including opportunity for public review and comment, for approval of any IUP Addendum(s) as developed by the Water Quality Control Division, the Division of Local Affairs, and the Colorado Water Resources and Power Development Authority, consistent with Section 300j-12(b) of the federal Safe Drinking Water Act.

The Commission adopted these revisions on both an emergency and permanent basis, with the intent that the permanent amendments become effective April 30, 2009.

PARTIES TO THE RULEMAKING

1. Denver Water
2. City of Aurora
3. Colorado Contractors Association
4. Northwest Colorado Council of Governments

5 CCR 1002-52.13

38 CR 17, September 10, 2015, effective 9/30/2015