5 Colo. Code Regs. § 1002-38.95

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-38.95 - STATEMENT OF BASIS SPECIFIC STATUTORY AUTHORITY AND PURPOSE APRIL 10, 2017 RULEMAKING; FINAL ACTION APRIL 10, 2017; EFFECTIVE DATE JUNE 30, 2017

The provisions of C.R S. 25-8-202(1)(a), (b) and (2); 25-8-203; 25-8-204; and 25-8-402; provide the specific statutory authority for adoption of these regulatory amendments. The commission also adopted in compliance with 24-4-103(4) C.R.S. the following statement of basis and purpose.

BASIS AND PURPOSE

In this hearing, the commission made several corrections to Regulation 38. Several errors have been identified which do not reflect the commission's intended decisions from recent hearings.

A.South Platte Segment 16i

The commission made a correction to the discharger specific variance for selenium on Upper South Platte Segment 16i that was originally adopted on October 11, 2016. The variance is expressed as a hybrid standard, with the first number as the underlying standard previously adopted by the commission for the segment. The underlying chronic selenium standard for this portion of Segment 16i is 9.0 µg/L (see 38.6(4)(f) for site-specific standards and assessment locations). Therefore, the first number in the variance should be 9.0 µg/L.

B.Clear Creek Segments 14a and 14b

The commission deleted the arsenic temporary modification from Clear Creek Segment 14a and adopted an arsenic temporary modification on Clear Creek Segment 14b. When the commission took preliminary final action on changes from the June 2015 Regulation 38 rulemaking hearing, the commission decided not to adopt the proposed arsenic temporary modification on Clear Creek Segment 14a. During the formation of final action documents, the arsenic temporary modification was inadvertently removed from Clear Creek Segment 14b instead of Clear Creek 14a.

C.Big Thompson Segment 2

The commission corrected the antidegradation designation for Big Thompson River Segment 2. During the June 2015 Regulation 38 rulemaking hearing, the antidegradation designation was inadvertently changed from reviewable to use protected. Because this change was in error and data are available to show waters in this segment are high quality, the commission has removed the used protected designation and reapplied the reviewable designation to Big Thompson River Segment 2.

5 CCR 1002-38.95

38 CR 03, February 10, 2015, effective 6/30/2015
38 CR 17, September 10, 2015, effective 12/31/2015
39 CR 03, February 10, 2016, effective 3/1/2016
39 CR 03, February 10, 2016, effective 6/30/2016
39 CR 23, December 25, 2016, effective 12/30/2016
40 CR 03, February 10, 2017, effective 6/30/2017
40 CR 09, May 10, 2017, effective 6/30/2017
41 CR 01, January 10, 2018, effective 1/31/2018
41 CR 03, February 10, 2018, effective 6/30/2018
42 CR 04, February 25, 2019, effective 6/30/2019
43 CR 03, February 10, 2020, effective 6/30/2020
43 CR 17, September 10, 2020, effective 12/31/2020
44 CR 01, January 10, 2021, effective 2/14/2021
44 CR 05, March 10, 2021, effective 6/30/2021
44 CR 17, September 10, 2021, effective 12/31/2021
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 21, November 10, 2022, effective 11/30/2022
46 CR 10, May 25, 2023, effective 6/14/2023