The provisions of C.R.S. 25-8-202 (1)(a), (b) and (2); 25-8-203; 25-8-204; and 25-8-402; provide the specific statutory authority for adoption of these regulatory amendments. The Commission also adopted in compliance with 24-4-103(4) C.R.S. the following statement of basis and purpose.
BASIS AND PURPOSE
Pursuant to the requirements in the Basic Standards (at 31.7(3)), the Commission reviewed the status of temporary modifications scheduled to expire before December 31, 2017, to determine whether the temporary modification should be modified, eliminated or extended. Temporary modifications of standards on one segment was reviewed.
Lower Colorado segment 4e: Temporary modifications of the copper and iron standards. Tri-state Generation and Transmission, Inc. provided evidence that it is making progress on the plan for eliminating the need for the temporary modification and on resolving the uncertainty regarding the underlying standards. The Commission made no change to the expiration date of 6/30/2017 for copper, and 12/31/2017 for iron as the time allotment was deemed adequate.
PARTIES TO THE RULEMAKING HEARING
5 CCR 1002-37.36