5 Colo. Code Regs. § 1002-37.29

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-37.29 - STATEMENT OF BASIS SPECIFIC STATUTORY AUTHORITY AND PURPOSE JUNE 13, 2011 RULEMAKING REGARDING TEMPORARY MODIFICATIONS; EFFECTIVE DATE JANUARY 1,2012

The provisions of C.R S. 25-8-202 (1)(a), (b) and (2); 25-8-203; 25-8-204; and 25-8-402; provide the specific statutory authority for adoption of these regulatory amendments. The Commission also adopted in compliance with 24-4-103(4) C.R.S. the following statement of basis and purpose.

BASIS AND PURPOSE

The Commission's decision to delay consideration of nutrient criteria until March 2012, resulted in cancelation of the December 2011 review of temporary modifications. Accordingly, the Commission considered the expiration dates of temporary modifications expiring on or before December 31, 2012 in a written comment rulemaking.

The Commission extended the expiration date of the following temporary modification to December 31, 2013. It will be reviewed again in a Temporary Modification hearing in December 2012.

Lower Colorado segment 4e (Cu, Fe)

The Commission extended the expiration date of the following temporary modification to June 30, 2013. It is anticipated that the City of Grand Junction will propose a site-specific temperature standard for consideration at the December 2012 Temporary Modification hearing.

Lower Colorado segment 13b, Persigo Wash from the Grand Junction discharge to the confluence with the Colorado River (Temperature)

The following temporary modifications were deleted because they will have expired as of the effective date of this revision:

Lower Colorado segment 2b (NH3)

Lower Colorado segment 13b (NH3)

Lower Colorado segment 13d (Se, expired 5/31/2011).

5 CCR 1002-37.29

39 CR 03, February 10, 2016, effective 3/1/2016
39 CR 03, February 10, 2016, effective 6/30/2016
40 CR 03, February 10, 2017, effective 6/30/2017
41 CR 03, February 10, 2018, effective 6/30/2018
42 CR 04, February 25, 2019, effective 6/30/2019
42 CR 17, September 10, 2019, effective 12/31/2019
43 CR 03, February 10, 2020, effective 6/30/2020
44 CR 05, March 10, 2021, effective 6/30/2021
44 CR 17, September 10, 2021, effective 12/31/2021
45 CR 17, September 10, 2022, effective 9/30/2022
46 CR 10, May 25, 2023, effective 6/14/2023