5 Colo. Code Regs. § 1002-36.40

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-36.40 - STATEMENT OF BASIS SPECIFIC STATUTORY AUTHORITY AND PURPOSE; DECEMBER 11, 2017 RULEMAKING; FINAL ACTION DECEMBER 11, 2017; EFFECTIVE DATE JANUARY 31, 2018

The provisions of C.R S. 25-8-202(1)(a), (b) and (2); 25-8-203; 25-8-204; and 25-8-402; provide the specific statutory authority for adoption of these regulatory amendments. The commission also adopted, in compliance with 24-4-103(4) C.R.S., the following statement of basis and purpose.

BASIS AND PURPOSE

In this hearing, the commission made corrections to Regulation No. 36. Several errors have been identified which do not reflect the commission's intended decisions from recent hearings.

A.Section 36.6

The commission corrected a series of typos in Section 36.6(4)(c). Several of the lead values were erroneously written "acute/chromium"; the commission replaced the word "chromium" with the word "chronic".

B.Alamosa Segment 28

The commission made corrections to the description of Alamosa Segment 28. A typo was corrected and Alamosa Segment 30 was added as an exception.

C.Alamosa Segment 29

The commission made a correction to the description of Alamosa Segment 29. Alamosa Segment 8 was added as an exception.

D.Closed Basin Segment 3

The commission made a correction to the description of Closed Basin Segment 3. Closed Basin Segment 1 was added as an exception.

E.Closed Basin Segment 9a

The commission made corrections to the description of Closed Basin Segment 9a. The extra "tributaries and wetlands" was removed. In addition, the description of the start of the segment was corrected to "a point immediately above the Cocomongo Mill site" instead of "the source".

5 CCR 1002-36.40

38 CR 03, February 10, 2015, effective 6/30/2015
39 CR 03, February 10, 2016, effective 3/1/2016
39 CR 03, February 10, 2016, effective 6/30/2016
40 CR 03, February 10, 2017, effective 6/30/2017
41 CR 01, January 10, 2018, effective 1/31/2018
41 CR 03, February 10, 2018, effective 6/30/2018
41 CR 17, September 10, 2018, effective 12/31/2018
42 CR 04, February 25, 2019, effective 6/30/2019
43 CR 03, February 10, 2020, effective 6/30/2020
44 CR 05, March 10, 2021, effective 6/30/2021
44 CR 17, September 10, 2021, effective 12/31/2021
45 CR 17, September 10, 2022, effective 9/30/2022
46 CR 10, May 25, 2023, effective 6/14/2023