5 Colo. Code Regs. § 1002-32.17

Current through Register Vol. 47, No. 11, June 10, 2024
Section 5 CCR 1002-32.17 - STATEMENT OF BASIS, SPECIFIC STATUTORY AUTHORITY, AND PURPOSE; AUGUST, 1991, HEARING:

The provisions of 25-8-202(1), (b) and (2); 25-8-204; and 25-8-402 C.R.S. provide the specific statutory authority for adoption of these regulatory amendments. The Commission also adopted, in compliance with 24-4-103(4), C.R.S., the following statement of basis and purpose.

BASIS AND PURPOSE:

On February 5, 1991, the Commission held an emergency rulemaking hearing to revise the numerical standards for one segment of the Arkansas River Basin. Specifically, the dissolved manganese standard was removed and other metals standards for Upper Arkansas segment 9 corrected, to reflect the fact that the water supply classification was previously removed from this segment. Emergency adoption was deemed appropriate because the Commission previously removed the water supply classification from this segment and inadvertently did not correspondingly change the numerical standards. The factual basis for these revisions is unchanged and the Commission has therefore made them permanent. In addition, the Commission has added an expiration date for the temporary modifications for this segment. The intent of the Commission in adopting the date selected is that expiration correspond with the next triennial review of this segment, at which time it is anticipated that dissolved metals data will be available to set new standards consistent with the criteria of the basic standards.

PARTIES TO THE AUGUST 5, 1991 RULEMAKING HEARING FOR THE UPPER ARKANSAS SEGMENT 9 ARKANSAS RIVER BASIN

1. Res-ASARCO Joint Venture

5 CCR 1002-32.17

38 CR 03, February 10, 2015, effective 6/30/2015
39 CR 03, February 10, 2016, effective 3/1/2016
39 CR 03, February 10, 2016, effective 6/30/2016
39 CR 23, December 25, 2016, effective 12/30/2016
40 CR 03, February 10, 2017, effective 6/30/2017
41 CR 01, January 10, 2018, effective 1/31/2018
41 CR 03, February 10, 2018, effective 6/30/2018
41 CR 17, September 10, 2018, effective 12/31/2018
42 CR 04, February 25, 2019, effective 6/30/2019
43 CR 03, February 10, 2020, effective 6/30/2020
44 CR 01, January 10, 2021, effective 2/14/2021
44 CR 05, March 10, 2021, effective 6/30/2021
44 CR 17, September 10, 2021, effective 12/31/2021
45 CR 17, September 10, 2022, effective 9/30/2022
46 CR 10, May 25, 2023, effective 6/14/2023