5 Colo. Code Regs. § 1001-12-V

Current through Register Vol. 47, No. 18, September 25, 2024
Section 5 CCR 1001-12-V - Enforceability of design concept and scope and project-level mitigation and control measures
V.A. Pursuant to 40 CFR Section 93.125(c), where project-level mitigation is conditional to a positive conformity determination, written commitments to such mitigation measures must be obtained. Project sponsors shall comply with these commitments.

5 CCR 1001-12-V

39 CR 05, March 10, 2016, effective 3/30/2016