5 Colo. Code Regs. § 1001-10-B-C

Current through Register Vol. 47, No. 16, August 25, 2024
Appendix 5 CCR 1001-10-B-C - Training Course Outline: Removal of Resilient Floor Coverings in Accordance with Appendix B

These courses are designed to train Workers to remove asbestos containing flooring materials in accordance with Appendix B to this regulation. Unless the flooring materials are removed in accordance with Sections I., II., and III. of this regulation, persons who remove asbestos-containing flooring materials must complete the 8-hour employee training course, including receiving a passing examination grade; persons who supervise the removal of asbestos-containing flooring materials must complete the 8-hour employee training course (including receiving a passing examination grade) and then successfully complete the additional course, including receiving a passing grade on a separate examination covering Sections 10-13 of this outline. NOTE: Completion of these training courses does not satisfy the training requirements for Colorado certification as an asbestos abatement Worker or asbestos abatement Supervisor as provided in Section II. of this regulation.

8-HOUR EMPLOYEE TRAINING COURSE

Section 1 Background Information on Asbestos (slides, lecture, workbook, quiz)

* Characteristics of asbestos

* Categories of asbestos-containing building materials

* Friable and nonfriable condition of materials

* List of suspect asbestos-containing materials

* Determination/identification of asbestos-containing materials (including presumptions regarding flooring materials)

* Control options

* Potential health effects related to exposure to airborne asbestos

* Hazards of smoking and asbestos exposure

* Protective work practices and controls to minimize asbestos exposure

Section 2 Laws and Regulations (video, slides, lecture, workbook, quiz)

* Current regulations concerning the removal and disposal of asbestos-containing materials

* Regulated areas/Respirators/Negative Air Pressure/Protective Clothing/Decontamination Procedures

* How regulations are enforced

* Federal Government agencies that regulate asbestos removal: OSHA Asbestos Standard, EPANESHAP, EPA AHERA and ASHARA, DOT Regulations

* Difference between federal and state asbestos laws

* State and local asbestos regulations

* Hazard Communication Standard and safety issues

Section 3 Asbestos-Containing Resilient Flooring Materials (slides, lecture, workbook, quiz)

* Walk-through survey versus bulk sample analysis

* Types of floor coverings, which contain asbestos

* Determining friability of resilient floor coverings (EPA Recommended Test)

* Flooring adhesives, which contain asbestos

* Alternatives to removing asbestos-containing floor covering and adhesives

* Methods which should not be used to remove resilient floor covering materials

* Waste disposal procedures

* Notification requirements

Section 4 Removal of Resilient Floor Tile

* Video demonstration of properly removing floor tile

* Live demonstration of properly removing floor tile

* "Hands on" student practice removing floor tiles using heat and without heat

* Quiz

Section 5 Removal of Residual Asphaltic Adhesive

* Video demonstration of proper procedure for removing adhesive

* Review of proper procedure for removing adhesive

* "Hands on" student practice removing adhesive

* Quiz

Section 6 Removal of Resilient Sheet Flooring

* Video demonstration of proper procedure for removing sheet flooring

* Live demonstration of proper procedure for removing sheet flooring

* "Hands on" student practice removing sheet flooring

* Quiz

Section 7 Complete Removal of Wood Underlayment

* Video demonstration of proper procedures for removing resilient flooring complete with underlayment

* Review of proper procedures for complete removal of wood underlayment

Section 8 Review

* Review previous instruction and clarify any unanswered questions

Section 9 Examination Covering Sections 1-7

ADDITIONAL TRAINING COURSE FOR PERSONS SUPERVISING THE REMOVAL OF FLOORING MATERIALS (4-Hour Minimum)

Section 10 Prework Activities and Considerations

* Determination of asbestos-containing materials: Methods of identification, walk through survey/bulk sampling, Common building materials containing asbestos

* Review of regulations: OSHA, EPA, DOT, State and Local

Section 11 Assessment of the Work Area

* Site preparation considerations

* Conducting a Negative Exposure Assessment

* Isolating the work area

* Adjacent areas

* Regulated areas

* Safety hazards

Section 12 Notification, Recordkeeping, and Waste Disposal

* Recordkeeping requirements

* Notification requirements

* Warning signs

* Special equipment

* Transport and disposal of asbestos waste

Section 13 Supervising Workers

* Establishing goals

* Providing clear instructions

* Establishing expectations

* Use of Supervisory authority

* Motivating Workers

Section 14 Review and Examination

* Review

* Examination (covering Sections 10-13)

5 CCR 1001-10-B-C

37 CR 18, September 25, 2014, effective 10/15/2014
38 CR 05, March 10, 2015, effective 3/30/2015
38 CR 18, September 25, 2015, effective 10/15/2015
39 CR 18, September 25, 2016, effective 10/15/2016
40 CR 12, June 25, 2017, effective 7/15/2017
41 CR 11, June 10, 2018, effective 6/30/2018
42 CR 16, August 25, 2019, effective 9/14/2019
43 CR 03, February 10, 2020, effective 1/16/2020
43 CR 03, February 10, 2020, effective 3/1/2020
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 04, February 25, 2021, effective 3/17/2021
44 CR 12, June 25, 2021, effective 7/15/2021
45 CR 12, June 25, 2022, effective 7/15/2022
46 CR 12, June 25, 2023, effective 7/15/2023
47 CR 12, June 25, 2024, effective 7/15/2024