6 Colo. Code Regs. § 1007-3-8.92

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-8.92 - Basis and Purpose

These amendments to 6 CCR 1007-3, Part 262 are made pursuant to the authority granted to the Solid and Hazardous Waste Commission in § 25-15-302(2), C.R.S.

Hazardous Waste Generator Improvements Rule Amendments

These amendments correct technical errors and inadvertent omissions that were identified after Colorado adopted state analogs to the federal Hazardous Waste Generator Improvements Rule on May 15, 2018.

These amendments correct typographical errors and inadvertent omissions that exist in §§ 262.10, 262.15, 262.16, 262.17, 262.18, 262.20, 262.230, 262.251, 262.261 and the Table of Contents for Part 262 of the current regulations.

The state requirements for very small quantity generators (VSQGs) of hazardous waste in Colorado are more stringent than the federal provisions. The Commission has evaluated the information presented at the rulemaking hearing, as well as the information in the Statement of Basis and Purpose. The Commission considers this information sufficient to justify adopting the proposed rule. The Commission finds that this rule is necessary to protect the public health and environment of the state.

Statement of Basis and Purpose Rulemaking Hearing of February 19, 2019

6 CCR 1007-3-8.92

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023