6 Colo. Code Regs. § 1007-3-8.66

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-8.66 - Basis and Purpose

This amendment to 6 CCR 1007-3, Part 261 is made pursuant to the authority granted to the Solid and Hazardous Waste Commission in § 25-15-302(2), C.R.S.

Amendment of § 261.5 Special Requirements for Conditionally Exempt Small Quantity Generators.

Section 261.5 of the Colorado Hazardous Waste Regulations (6 CCR 1007-3) is being amended at this time to require conditionally exempt small quantity generators (CESQGs) of hazardous waste to maintain and operate their facilities in a manner to minimize the possibility of a release.

While the current regulations require large quantity generators (LQGs) and small quantity generators (SQGs) of hazardous waste to operate their facilities in a manner to minimize the possibility of a release of hazardous waste or hazardous waste constituents that could threaten human health or the environment, CESQGs are not currently required to meet this same standard. This inconsistency in the regulations provides no incentive for CESQGs to properly manage their hazardous waste and potentially provides CESQGs with an economic advantage over SQGs and LQGs.

The Commission has evaluated the information presented at the rulemaking hearing, as well as the information in the Statement of Basis and Purpose. The Commission considers this information sufficient to justify adopting the proposed rule. The Commission finds that this rule is necessary to protect public health and the environment.

Statement of Basis and Purpose - Rulemaking Hearing of February 19, 2008 [Eff 03/30/2008]

6 CCR 1007-3-8.66

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023