Section 6 CCR 1007-3-260.33 - Procedures for variances from classification as a solid waste, for variances to be

classified as a boiler, or for non-waste determinations.

The Department will use the following procedures in evaluating applications for variances from classification as a solid waste or applications to classify particular enclosed controlled flame combustion devices as boilers:

(a) The applicant must apply to the Department for the variance or non-waste determination. The application must address the relevant criteria contained in § 260.31, § 260.32, or § 260.34 of this Part, as applicable.
(b) The Department will evaluate the application and issue a draft notice tentatively granting or denying the application. Notification of this tentative decision will be provided by newspaper advertisement or radio broadcast in the locality where the recycler is located. The Department will accept comment on the tentative decision for 30 days, and may also hold a public hearing upon request or at its discretion. The Department will issue a final decision after receipt of comments and after the hearing (if any).
(c) In the event of a change in circumstances that affect how a hazardous secondary material meets the relevant criteria contained in § 260.31, § 260.32, or § 260.34 upon which a variance or non-waste determination has been based, the applicant must send a description of the change in circumstances to the Department. The Department may issue a determination that the hazardous secondary material continues to meet the relevant criteria of the variance or non-waste determination or may require the facility to re-apply for the variance or non-waste determination.
(d) Variances and non-waste determinations shall be effective for a fixed term not to exceed ten years. No later than six months prior to the end of this term, facilities must re-apply for a variance or non-waste determination. If a facility re-applies for a variance or non-waste determination within six months, the facility may continue to operate under an expired variance or non-waste determination until receiving a decision on their re-application from the Department.
(e) Facilities receiving a variance or non-waste determination must provide notification as required by § 260.42 of these regulations.

6 CCR 1007-3-260.33

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023