6 Colo. Code Regs. § 1007-3-260.4

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-260.4 - Manifest copy submission requirements for certain interstate waste shipments
(a) In any case in which the state in which waste is generated, or the state in which waste will be transported to a designated facility, requires that the waste be regulated as a hazardous waste or otherwise be tracked through a hazardous waste manifest, the designated facility that receives the waste shall, regardless of the state in which the facility is located:
(1) Complete the facility portion of the applicable manifest;
(2) Sign and date the facility certification;
(3) Submit to the e-Manifest system a final copy of the manifest for data processing purposes; and
(4) Pay the appropriate per manifest fee to EPA for each manifest submitted to the e-Manifest system, subject to the fee determination methodology, payment methods, dispute procedures, sanctions, and other fee requirements specified in subpart FF of 40 CFR part 264 . Subpart FF of 40 CFR part 264 is incorporated by reference to include those versions in effect as of the date this regulation was adopted, and does not include later amendments to the incorporated material. Materials incorporated by reference are available for public inspection during normal business hours from the Hazardous Materials and Waste Management Division, 4300 Cherry Creek Drive South, Denver, CO 80246. Copies may also be found at the Environmental Protection Agency through the Government Printing Office at https://www.govinfo.gov/app/collection/cfr/

6 CCR 1007-3-260.4

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023
46 CR 12, June 25, 2023, effective 7/15/2023