6 Colo. Code Regs. § 1007-3-100.6.62

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-100.6.62 - Transfer of Permits
(a) A permit may be transferred by the permittee to a new owner or operator only if the permit has been modified or revoked and reissued (under § 100.61(b) or § 100.62(b) to identify the new permittee and incorporate such other requirements as may be necessary under the State Hazardous Waste Act.
(b) Changes in the ownership or operational control of a facility may be made as a Class 1 modification with prior written approval of the Director in accordance with § 100.63. The new owner or operator must submit a revised permit application no later than 90 days prior to the scheduled change. A written agreement containing a specific date for transfer of permit responsibility between the current and new permittees must also be submitted to the Director. When a transfer of ownership or operational control occurs, the old owner or operator shall comply with the requirements of Part 266 (Financial Requirements) until the new owner or operator has demonstrated that he or she is complying with the requirements of that part. The new owner or operator must demonstrate compliance with Part 266 requirements within six months of the date of the change of ownership or operational control of the facility. Upon demonstration to the Director by the new owner or operator of compliance with Part 266, the Director shall notify the old owner or operator that he or she no longer needs to comply with Part 266 as of the date of demonstration.

6 CCR 1007-3-100.6.62

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023