Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.20 - Maintenance and Testing22.20.1 Each licensee subject to section C of this Part shall implement a maintenance and testing program to ensure that intrusion alarms, associated communication systems, and other physical components of the systems used to secure or detect unauthorized access to radioactive material are maintained in operable condition and are capable of performing their intended function when needed. The equipment relied on to meet the security requirements of this Part must be inspected and tested for operability and performance at the manufacturer's suggested frequency. If there is no suggested manufacturer's suggested frequency, the testing must be performed at least annually, not to exceed 12 months.22.20.2 The licensee shall maintain records on the maintenance and testing activities for 3 years.Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/201438 CR 02, January 25, 2015, effective 2/14/201538 CR 05, March 10, 2015, effective 3/30/201538 CR 12, June 25, 2015, effective 7/15/201538 CR 14, July 25, 2015, effective 8/14/201539 CR 02, January 25, 2016, effective 2/14/201639 CR 16, August 25, 2016, effective 9/14/201639 CR 22, November 25, 2016, effective 12/15/201640 CR 11, June 10, 2017, effective 6/30/201740 CR 20, October 25, 2017, effective 11/14/201742 CR 24, December 25, 2019, effective 1/14/202043 CR 14, July 25, 2020, effective 8/14/202043 CR 18, September 25, 2020, effective 10/15/202044 CR 11, June 10, 2021, effective 7/15/202144 CR 14, July 25, 2021, effective 8/14/202145 CR 22, November 25, 2022, effective 12/15/2022