Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.17 - LLEA Coordination22.17.1 A licensee subject to section C of this Part shall coordinate, to the extent practicable, with an LLEA for responding to threats to the licensee's facility, including any necessary armed response. The information provided to the LLEA must include: A. A description of the facilities and the category 1 and category 2 quantities of radioactive materials along with a description of the licensee's security measures that have been implemented to comply with section C of this Part; andB. A notification that the licensee will request a timely armed response by the LLEA to any actual or attempted theft, sabotage, or diversion of category 1 or category 2 quantities of material.22.17.2 The licensee shall notify the Department within 3 business days if: A. The LLEA has not responded to the request for coordination within 60 days of the coordination request; orB. The LLEA notifies the licensee that the LLEA does not plan to participate in coordination activities.22.17.3 The licensee shall document its efforts to coordinate with the LLEA. The documentation must be kept for 3 years.22.17.4 The licensee shall coordinate with the LLEA at least every 12 months, or when changes to the facility design or operation adversely affect the potential vulnerability of the licensee's material to theft, sabotage, or diversion.Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/201438 CR 02, January 25, 2015, effective 2/14/201538 CR 05, March 10, 2015, effective 3/30/201538 CR 12, June 25, 2015, effective 7/15/201538 CR 14, July 25, 2015, effective 8/14/201539 CR 02, January 25, 2016, effective 2/14/201639 CR 16, August 25, 2016, effective 9/14/201639 CR 22, November 25, 2016, effective 12/15/201640 CR 11, June 10, 2017, effective 6/30/201740 CR 20, October 25, 2017, effective 11/14/201742 CR 24, December 25, 2019, effective 1/14/202043 CR 14, July 25, 2020, effective 8/14/202043 CR 18, September 25, 2020, effective 10/15/202044 CR 11, June 10, 2021, effective 7/15/202144 CR 14, July 25, 2021, effective 8/14/202145 CR 22, November 25, 2022, effective 12/15/2022