6 Colo. Code Regs. § 1007-1-22.17

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.17 - LLEA Coordination
22.17.1 A licensee subject to section C of this Part shall coordinate, to the extent practicable, with an LLEA for responding to threats to the licensee's facility, including any necessary armed response. The information provided to the LLEA must include:
A. A description of the facilities and the category 1 and category 2 quantities of radioactive materials along with a description of the licensee's security measures that have been implemented to comply with section C of this Part; and
B. A notification that the licensee will request a timely armed response by the LLEA to any actual or attempted theft, sabotage, or diversion of category 1 or category 2 quantities of material.
22.17.2 The licensee shall notify the Department within 3 business days if:
A. The LLEA has not responded to the request for coordination within 60 days of the coordination request; or
B. The LLEA notifies the licensee that the LLEA does not plan to participate in coordination activities.
22.17.3 The licensee shall document its efforts to coordinate with the LLEA. The documentation must be kept for 3 years.
22.17.4 The licensee shall coordinate with the LLEA at least every 12 months, or when changes to the facility design or operation adversely affect the potential vulnerability of the licensee's material to theft, sabotage, or diversion.

6 CCR 1007-1-22.17

Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/2014
38 CR 02, January 25, 2015, effective 2/14/2015
38 CR 05, March 10, 2015, effective 3/30/2015
38 CR 12, June 25, 2015, effective 7/15/2015
38 CR 14, July 25, 2015, effective 8/14/2015
39 CR 02, January 25, 2016, effective 2/14/2016
39 CR 16, August 25, 2016, effective 9/14/2016
39 CR 22, November 25, 2016, effective 12/15/2016
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 20, October 25, 2017, effective 11/14/2017
42 CR 24, December 25, 2019, effective 1/14/2020
43 CR 14, July 25, 2020, effective 8/14/2020
43 CR 18, September 25, 2020, effective 10/15/2020
44 CR 11, June 10, 2021, effective 7/15/2021
44 CR 14, July 25, 2021, effective 8/14/2021
45 CR 22, November 25, 2022, effective 12/15/2022