Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.6 - Specific Exemptions22.6.1 The Department may, upon application of any interested person or upon its own initiative, grant such exemptions from the requirements of the regulations in this Part as it determines are authorized by law and will not endanger life or property or the physical protection of material, and are otherwise in the public interest.22.6.2 A licensee that possesses radioactive waste that contains category 1 or category 2 quantities of radioactive material is exempt from the requirements of sections B, C and D of this part. Except that any radioactive waste that contains discrete sources, ion-exchange resins, or activated material that weighs less than 2,000 kg (4,409 lbs) is not exempt from the requirements of this Part. The licensee shall implement the following requirements to secure the radioactive waste: A. Use continuous physical barriers that allow access to the radioactive waste only through established access control points;B. Use a locked door or gate with monitored alarm at the access control point;C. Assess and respond to each actual or attempted unauthorized access to determine whether an actual or attempted theft, sabotage, or diversion occurred; andD. Immediately notify the LLEA and request an armed response from the LLEA upon determination that there was an actual or attempted theft, sabotage, or diversion of the radioactive waste that contains category 1 or category 2 quantities of radioactive material.Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/201438 CR 02, January 25, 2015, effective 2/14/201538 CR 05, March 10, 2015, effective 3/30/201538 CR 12, June 25, 2015, effective 7/15/201538 CR 14, July 25, 2015, effective 8/14/201539 CR 02, January 25, 2016, effective 2/14/201639 CR 16, August 25, 2016, effective 9/14/201639 CR 22, November 25, 2016, effective 12/15/201640 CR 11, June 10, 2017, effective 6/30/201740 CR 20, October 25, 2017, effective 11/14/201742 CR 24, December 25, 2019, effective 1/14/202043 CR 14, July 25, 2020, effective 8/14/202043 CR 18, September 25, 2020, effective 10/15/202044 CR 11, June 10, 2021, effective 7/15/202144 CR 14, July 25, 2021, effective 8/14/202145 CR 22, November 25, 2022, effective 12/15/2022