6 Colo. Code Regs. § 1007-1-6-A

Current through Register Vol. 47, No. 11, June 10, 2024
Appendix 6 CCR 1007-1-6-A - INFORMATION REQUIRED FOR EVALUATION OF RADIATION SHIELDING

6A.1 In order to provide an evaluation and technical advice on shielding requirements for a radiation installation, the following information shall be submitted to the qualified expert or registered medical physicist.

6A.1.1 The submittals shall include a dimensional, scaled drawing of the facility which shows the following:

(1) The normal location of the x-ray imaging system's radiation port; the port's travel and traverse limits; general direction(s) of the useful beam; locations of any windows and doors; the location of the operator's booth; and the location of the x-ray control panel.

(2) The structural composition and thickness of all walls, doors, partitions, floor, and ceiling of the room(s) concerned.

(3) The dimensions of the room(s) concerned and inter-floor distances if space above or below is occupied.

(4) The type of occupancy of all adjacent areas inclusive of space above and below the room(s) concerned.

(5) If there is an exterior wall, the distance to the closest area(s) where it is likely that individuals may be present.

(6) A description of the x-ray imaging system and components, including the make and model of the equipment.

(7) The type of examination(s) or treatment(s) that will be performed with the equipment.

6A.1.2 Information on the anticipated workload of the x-ray imaging system(s).

6 CCR 1007-1-6-A

Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/2014
38 CR 02, January 25, 2015, effective 2/14/2015
38 CR 05, March 10, 2015, effective 3/30/2015
38 CR 12, June 25, 2015, effective 7/15/2015
38 CR 14, July 25, 2015, effective 8/14/2015
39 CR 02, January 25, 2016, effective 2/14/2016
39 CR 16, August 25, 2016, effective 9/14/2016
39 CR 22, November 25, 2016, effective 12/15/2016
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 20, October 25, 2017, effective 11/14/2017
42 CR 24, December 25, 2019, effective 1/14/2020
43 CR 14, July 25, 2020, effective 8/14/2020
43 CR 18, September 25, 2020, effective 10/15/2020
44 CR 11, June 10, 2021, effective 7/15/2021
44 CR 14, July 25, 2021, effective 8/14/2021
45 CR 22, November 25, 2022, effective 12/15/2022