The provisions of sections 25-9-104(1)(a), 25-9-104(3), 25-9-104(4) and 25-9-106.2, C.R.S., provide the specific statutory authority for the adoption of these regulatory provisions. The Board also adopted, in compliance with section 24-4-103(4), C.R.S, the following statement of basis and purpose.
BASIS AND PURPOSE
Section 100.6:
The capitalization of the word "and" in the process descriptions for Class B industrial wastewater treatment facilities is an error. The case of the word "and" is, therefore, changed to lower case.
The Board recognizes that stormwater runoff is not an industrial wastewater. Therefore, the listing of "stormwater runoff control ponds" as an example of a process utilized in a class "D" industrial wastewater facility is an error and is hereby deleted.
5 CCR 1003-2-100.37