Revise and replace section AF103.3 Soil-gas-retarder as follows:
The soil in basements and enclosed crawl spaces shall be covered with a soil-gas-retarder. The soil-gas-retarder shall be lapped not less than 12 inches (305 mm) at joints and shall extend to foundation walls enclosing the basement or crawl space. The soil gas-retarder shall fit closely around any pipe, wire or other penetrations of the material. Punctures or tears in the material shall be sealed T or covered with additional sheeting. The membrane shall extend upward six inches be sealed to the perimeter footing or wall with an ASTM C290 class 25 or higher sealant or equal.
780 CMR, app AF § AF103.3