Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures, and sites for which an application has been filed.
780 CMR, ch. 1, pt. 2, 110, 110.2
Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures, and sites for which an application has been filed.
780 CMR, ch. 1, pt. 2, 110, 110.2