3.18.3.8.3 Delete (a), (c) and (d) and add to (b): "All new cylinders installed below ground shall be provided with schedule 40 or greater PVC liner surrounding it for corrosion protection as described by 3.18.3.8."
524 CMR, § 35, § 3.18
3.18.3.8.3 Delete (a), (c) and (d) and add to (b): "All new cylinders installed below ground shall be provided with schedule 40 or greater PVC liner surrounding it for corrosion protection as described by 3.18.3.8."
524 CMR, § 35, § 3.18