522 CMR, § 2.07

Current through Register 1538, January 3, 2025
Section 2.07 - General Requirements

Pressure Tests. When it is unclear as to the extent of a defect or condition found in a High Pressure/Power Boiler, the District Engineering Inspector or the Authorized Inspector may require a pressure test at any time. Such tests shall be performed in accordance with the NBIC and the Engineer in Charge shall notify the Chief in writing of the date that such pressure test will be performed.

522 CMR, § 2.07

Adopted by Mass Register Issue 1321, eff. 9/9/2016.
Amended by Mass Register Issue 1402, eff. 10/18/2019.
Amended by Mass Register Issue 1458, eff. 12/10/2021.