Current through Register 1533, October 25, 2024
Section 1.04 - Department Jurisdiction(1)Enforcement. Pursuant to M.G.L. c. 146, § 5, the Division shall enforce M.G.L. 146, and 522 CMR, except when otherwise provided.(2) District Engineering Inspectors may enter any premises pursuant to M.G.L. c. 146, § 5.(3)Inspection. A District Engineering Inspector shall perform the First Inspection of a Boiler or Pressure Vessel as required by M.G.L. c. 146, § 6.(a)Boilers. All Boilers and their Appurtenances shall be thoroughly inspected externally and internally under the specifications of 522 CMR 2.00: Power Boilers and 522 CMR 4.00: Heating Boilers and Other Heat Storage Sources, except:1. those specified in M.G.L. c. 146, § 7, which includes Boilers of railroad locomotives, motor vehicles or steam fire engines brought into the Commonwealth for temporary use in times of emergency;2. Boilers used in private residences;3. those used for heating purposes which carry pressures not exceeding 15 pounds to the square inch and have less than four square feet of grate surface; and4. Boilers of not more than three-horse power. Upon written application made to it by the Owner/User of a Boiler or Pressure Vessel, the Board may, when the public interest and convenience require, extend the time for the making of such inspection for a period not to exceed six months as the Board may determine.
(b)Air Tanks. All Air Tanks and their Appurtenances, except those specified in M.G.L. c. 146, § 34, shall be thoroughly inspected externally or internally consistent with the specifications set forth in 522 CMR 7.00: Air Tanks at least once every two years when the following criteria are met: 1. design MAWP greater than 50 PSI; and2. greater than six inches internal diameter; and3. internal volume greater than one cubic foot.(c)Massachusetts Tag Number.1. Every Boiler, Pressure Vessel, and Refrigeration System or air conditioning system which has been inspected by the Division shall be given a registration number upon a nonferrous metal tag authorized by the Board. The tag shall be held by nonferrous wire in a conspicuous place on the unit and no person, except a District Engineering Inspector, shall remove the tag.2. Authorized insurance companies shall be furnished tag numbers by the Chief for Refrigeration Systems, air conditioning systems or hot water Boiler systems. The authorized insurance companies shall furnish tags, authorized by the Board, upon which shall be the tag number. The tag shall be made of nonferrous metal and attached in a conspicuous place on the unit.Adopted by Mass Register Issue 1321, eff. 9/9/2016.Amended by Mass Register Issue 1353, eff. 12/1/2017.Amended by Mass Register Issue 1402, eff. 10/18/2019.Amended by Mass Register Issue 1458, eff. 12/10/2021.