Where:
Pf = Minimum allowable final pressure, inches of water.
v = Total ullage affected by the test, gallons.
e = Dimensionless constant equal to approximately 2.718.
2 = The initial pressure, inches water.
Table 1.
CARB Underground Storage Tank Phase I Enhanced Vapor Recovery System Executive Orders
Executive Order Number | Description | Date |
VR-101-V | Phil-Tite/EBW/FFS Phase I Vapor Recovery System | April 27, 2022 |
VR-102-V | OPW Phase I Vapor Recovery System | May 31, 2021 |
VR-104-L | CNI Manufacturing Phase I Vapor Recovery System | May 31, 2021 |
VR-105-J | EMCO Wheaton Phase I Vapor Recovery System | May 31, 2021 |
Table 2.
CARB Aboveground Storage Tank Phase I Enhanced Vapor Recovery System Executive Orders
Executive Order Number | Description | Date |
VR-301-I | Standing Loss Control of Vapor Recovery Systems for Existing Installations of Aboveground Storage Tanks | June 26, 2020 |
VR-302-I | Standing Loss Control of Vapor Recovery Systems for New Installations of Aboveground Storage Tanks | June 26, 2020 |
VR-401-F | OPW Phase I Enhanced Vapor Recovery (EVR) System for Aboveground Storage Tanks (AST) | July 17, 2019 |
VR-402-E | Morrison Brothers Phase I Enhanced Vapor Recovery (EVR) System for Aboveground Storage Tanks (AST) | July 17, 2019 |
G-70-216 | Extension of Effective Dates for Existing Aboveground Storage Tanks | March 13, 2014 |
Table A. MINIMUM ALLOWABLE PRESSURE (Based on an initial pressure of 10.0" wc.) | |||
Ullage (Gal) | Minimum Allowable Pressure ("wc) | Ullage (Gal) | Minimum Allowable Pressure ("wc) |
500 | 3.70 | 6,000 | 9.38 |
600 | 4.50 | 7,000 | 9.46 |
700 | 5.20 | 7,500 | 9.50 |
800 | 5.80 | 8,000 | 9.52 |
900 | 6.20 | 9,000 | 9.56 |
1,000 | 6.50 | 10,000 | 9.60 |
1,250 | 7.05 | 11,000 | 9.62 |
1,750 | 7.90 | 12,000 | 9.64 |
2,000 | 8.20 | 13,000 | 9.66 |
2,250 | 8.35 | 14,000 | 9.68 |
2,500 | 8.50 | 15,000 | 9.70 |
2,750 | 8.60 | 16,000 | 9.71 |
3,000 | 8.70 | 17,000 | 9.71 |
3,250 | 8.80 | 18,000 | 9.72 |
3,500 | 8.90 | 19,000 | 9.73 |
3,750 | 9.00 | 20,000 | 9.73 |
4,000 | 9.10 | 21,000 | 9.74 |
4,250 | 9.15 | 22,000 | 9.75 |
4,500 | 9.20 | 23,000 | 9.75 |
4,750 | 9.25 | 24,000 | 9.76 |
5,000 | 9.30 | 25,000 | 9.77 |
30,000 | 9.80 | ||
Note: For a valid test, total ullage must be at least 500 gallons but no more than 30,000 gallons. |
Exhibit 4: Vapor Return Line Vacuum Integrity Test.
Exhibit 5: Fillneck Vapor Pressure Regulation Fueling Test.
Healy 600 (Executive Order # G-70-165).
Exhibit 4: Vapor Return Line Vacuum Integrity Test.
Number | Description |
G-70-7-AD | Certification of the Hasstech Model VCP-2 and VCP 2A Phase II Vapor Recovery System. |
G-70-14-AA | Recertification of Red Jacket Aspirator Assist Phase II Vapor Recovery System. |
G-70-17-AD | Modification of Certification of the Emco Wheaton Balance Phase II Vapor Recovery System. |
G-70-18-C | Modification of Certification of the Shell Model 75B1 and 75B1-R3 Service Station Phase II Vapor Recovery System. |
G-70-23-AC | Recertification of the Exxon Balance Phase II Vapor Recovery System. |
G-70-25-AA | Recertification of the Atlantic Richfield Balance Phase II Vapor Recovery System. |
G-70-33-AB | Certification of the Modified Hirt VCS-200 Vacuum Assist Phase II Vapor Recovery System. |
G-70-36-AD | Modification of Certification of the OPW Balance Phase II Vapor Recovery System. |
G-70-37-B | Modification of the Certification of the Chevron Balance Phase II Vapor Recovery System with OPW nozzles for Service. |
G-70-38-AB | Recertification of the Texaco Balance Phase II Vapor Recovery System. |
G-70-48-AA | Recertification of the Mobil Oil Balance Phase II Vapor Recovery System. |
G-70-49-AA | Recertification of the Union Balance Phase II Vapor Recovery System. |
G-70-52-AM | Certification of Components for Red Jacket, Hirt and Balance Phase II Vapor Recovery System. |
G-70-53-AA | Recertification of the Chevron Balance Phase II Vapor Recovery System. |
G-70-77 | Certification of the OPW Repair/Replacement Parts and Modification of the Certification of the OPW Balance Phase II Vapor Recovery System. |
G-70-78 | Certification of the E-Z Flo Nozzle Company Rebuilt Vapor Recovery Nozzles and Vapor Recovery Components. |
G-70-101-B | Certification of the E-Z Flo Model 3006 and 3007 Vapor Recovery Nozzles and Use of E-Z Flo Components with OPW Models 11VC and 11 VE Vapor Recovery Nozzles. |
G-70-107 | Certification of Rainbow Petroleum Products Model RA3003, RA3005, RA3006 and RA3007 Vapor Recovery Nozzles and Vapor Recovery Components. |
G-70-110 | Certification of Stage I and II Vapor Recovery Systems for Methanol Fueling Facilities. |
G-70-118-AB | Certification of Amoco V-1 Vapor Recovery System. |
G-70-125-AA | Modification of the Certification of the Husky Model V Phase II Balance Vapor Recovery Nozzle. |
G-70-127 | Certification of the OPW Model 111-V Phase Vapor Recovery Nozzle. |
G-70-134 | Certification of the EZ Flo Rebuilt A-4000 Series and 11V-Series Vapor Recovery System. |
G-70-139 | Addition to the Certification of the Hirt Model VCS-200 Phase II Vapor Recovery System. |
G-70-150-AE | Modification of the Certification of the Gilbarco VaporVac Phase II Vapor Recovery System. |
G-70-153-AD | Modification to the Certification of the Dresser/Wayne WayneVac Phase II Vapor Recovery System. |
G-70-154-AA | Modification to the Certification of the Tokheim MaxVac Phase II Vapor Recovery System. |
G-70-159-AB | Modifiaction of the Certification of the Saber Nozzle for Use with the Gilbarco VaporVac Phase II Vapor Recovery System. |
G-70-163-AA | Certification of the OPW VaporEZ Phase II Vapor Recovery System. |
G-70-164-AA | Modification to the Certification of the Hasstech VCP-3A Vacuum Assist Phase II Vapor Recovery System. |
G-70-165 | Healy Vacuum Assist Phase II Vapor Recovery System. |
G-70-169-AA | Modification to the Certification of the Franklin Electric INTELLIVAC Phase II Vapor Recovery System. |
G-70-170 | Certification of the EZ-flo Rebuilt 5005 and 5015 for use with the Balance Phase II Vapor Recovery System. |
G-70-177-AA | Certification of the VCS400-7 Vacuum Assist Phase II Vapor Recovery System. |
G-70-179 | Certification of the Catlow ICVN-V1 Vacuum Assist Phase II Vapor Recovery System. |
G-70-180 | Order Revoking Certification of the Healy Phase II Vapor Recovery Systems for Gasoline Dispensing Systems. |
G-70-183-AA | Certification of the Healy/Franklin Vacuum Assist Phase II Vapor Recovery System. |
G-70-186 | Certification of the Healy Model 400 ORVR Vapor Recovery System. |
G-70-188 | Certification of the Catlow ICVN Vapor Recovery Nozzle System for use with the Gilbarco VaporVac Vapor Recovery System. |
G-70-191AA | Healy/Franklin VP-1000 Vapor Pump Phase II Vapor Recovery System(Healy ORVR Phase II Vapor Recovery System). |
G-70-196 | Certification of the Saber Technologies, LLC SaberVac VR Phase II Vapor Recovery System |
G-70-199-AJ | Certification of the Gasoline Dispensing Nozzles to the Liquid Retention of 350 milliliters per 1,000 Gallons Dispensed. |
VR-201-A | Healy System Inc. Phase II Enhanced Vapor Recovery (EVR) System Not Including ISD |
EVR-202-A | Healy Phase II Enhanced Vapor Recovery System Including Veeder-Root ISD System |
G-70-204-A | Certification of the Gilbarco VaporVac/OPW Vaporsaver ORVR-Compatible System |
Number | Description |
G-70-102-A | Certification of a Phase I Vapor Recovery System for Aboveground Storage Tanks with less than 40,000 Gallons Capacity for Gasoline or Gasoline/Methanol Blended Fuels |
G-70-116-F | ConVault Aboveground Tank Vapor Recovery System |
G-70-128 | Bryant Fuel Cell Aboveground Tank Vapor Recovery System |
G-70-130A | Petrovault Aboveground Tank Vapor Recovery System |
G-70-131A | Tank Vault Aboveground Tank Vapor Recovery System |
G-70-132-A | Supervault Aboveground Tank Vapor Recovery System |
G-70-132-B | Supervault Aboveground Tank Vapor Recovery System |
G-70-136 | FireSafe Aboveground Tank Vapor Recovery System |
G-70-137 | FuelSafe Aboveground Tank Vapor Recovery System |
G-70-138 | Phase II Vapor Recovery Systems Installed on Gasoline Bulk Plants/Dispensing Facilities with Aboveground Tanks |
G-70-139 | Addition to the Certification of the Hirt Model VCS-200 Phase II Vapor Recovery System |
G-70-140-A | Integral Phase I and Phase II Aboveground Tank Configurations with the Healy Phase II Vapor Recovery System |
G-70-142-B | Phase I Vapor Recovery System for Aboveground Gasoline Storage Tanks |
G-70-143 | P/T Vault Aboveground Tank Vapor Recovery System |
G-70-147-A | New United Motors Manufacturing, Incorporated Phase II Vapor Recovery System at the Fremont, California Assembly Plant |
G-70-148-A | Lube Cube Aboveground Tank Vapor Recovery System |
G-70-152 | Moiser Brothers Tanks and Manufacturing Aboveground Tank Vapor Recovery System |
G-70-155 | Petroleum Marketing Aboveground Tank Vapor Recovery System |
G-70-156 | Ecovault Aboveground Tank Vacuum Assist Vapor Recovery System |
G-70-157 | Ecovault Aboveground Tank Balance Vapor Recovery System |
G-70-158-A | Firesafe Aboveground Tank Vapor Recovery System |
G-70-160 | Aboveground Tank Vault Vapor Recovery System |
G-70-161 | Hoover Containment Systems, Incorporated Fuelmaster Aboveground Tank Vapor Recovery System |
G-70-162-A | Steel Tank Institute Fireguard Aboveground Tank Vapor Recovery System |
G-70-167 | EnviroVault Aboveground Tank Vapor Recovery System |
G-70-168 | Bryant Fuel Systems Phase I Vapor Recovery System |
G-70-175 | Hasstech VCP-3A Vacuum Assist Phase II Vapor Recovery System for Aboveground Tank Systems |
G-70-181 | Hirt VCS400-7 Bootless Nozzle Phase II Vapor Recovery System for Aboveground Storage Tank Systems |
G-70-187 | Healy Model 400 ORVR Vapor Recovery System for Aboveground Tank Systems |
G-70-190 | Guardian Containment, Corporation Armor Cast Aboveground Tank Vapor Recovery System |
G-70-192 | Certification of the Healy Model 400 ORVR Nozzle for Existing Aboveground Storage Tank Systems |
G-70-193 | Certification of the Hill-Vac Vapor Recovery System for Cargo Tank Motor Vehicle Fueling Systems |
G-70-194 | Containment Solutions Hoover Vault Aboveground Tank Vapor Recovery System |
G-70-195 | Cretex Companies, Inc FuelVault Aboveground Tank Vapor Recovery System |
G-70-197 | Synchrotek Fastflo 3 Phase II Vapor Recovery System |
G-70-200 | Oldcastle Aboveground Below-grade Fuel Vault with Balance Vapor Recovery System and Buried Vapor Return Piping |
G-70-201 | Oldcastle Aboveground Below-grade Fuel Vault with Balance Vapor Recovery System and Trenched Vapor Return Piping |
G-70-202 | Oldcastle Aboveground Below-grade Fuel Vault with Gilbarco VaporVac Phase II Recovery System and Trenched Vapor Return Piping |
Table 1.
CARB Underground Storage Tank Enhanced Vapor Recovery System Executive Orders
Executive Order Number | Description | Date |
VR-101-N | Phil-Tite Phase I Vapor Recovery System. | June 8, 2013 |
VR-102-O | OPW Phase I Vapor Recovery System. | October 3, 2014 |
VR-103-G | EBW Phase I Vapor Recovery System. | June 3, 2013 |
VR-104-G | CNI Manufacturing Phase I Vapor Recovery System. | June 8, 2013 |
VR-105-D | EMCO Wheaton Phase I Vapor Recovery System | August 27, 2014 |
Table 2.
CARB Aboveground Storage Tank Enhanced Vapor Recovery System Executive Orders
Executive Order Number | Description | Date |
VR-301-F | Standing Loss Control of Vapor Recovery Systems for Existing Installations of Aboveground Storage Tanks | June 3, 2014 |
VR-302-F | Standing Loss Control of Vapor Recovery Systems for New Installations of Aboveground Storage Tanks | June 3, 2014 |
VR-401-D | OPW Enhanced Vapor Recovery (EVR) System for Above Ground Storage Tanks (AST) | May 12, 2014 |
VR-402-B | Morrison Brothers Phase I Enhanced Vapor Recovery (EVR) System for Above Ground Storage Tanks (AST) | April 15, 2013 |
G-70-216 | Extension of Executive Orders for Existing Above Ground Storage Tanks | March 13, 2014 |
TABLE 7.24(7)(c) - 1.
SPECIFIC GRAVITY AND WEIGHT FRACTION OXYGEN OF COMMON OXYGENATES
Oxygenate | Weight Fraction Oxygen | Specific Gravity |
Methyl alcohol | 0.4993 | 0.7963 |
Ethyl alcohol | 0.3473 | 0.7939 |
Normal propyl alcohol | 0.2662 | 0.8080 |
Isopropyl alcohol | 0.2662 | 0.7899 |
Normal butyl alcohol | 0.2158 | 0.8137 |
Isobutyl alcohol | 0.2158 | 0.8058 |
Secondary butyl alcohol | 0.2158 | 0.8114 |
Tertiary butyl alcohol | 0.2158 | 0.7922 |
Methyl tertiary butyl ether (MTBE) | 0.1815 | 0.7460 |
Tertiary amyl methyl ether (TAME) | 0.1566 | 0.7752 |
Ethyl tertiary butyl ether (ETBE) | 0.1566 | 0.7452 |
Di-isopropyl ether (DIPE) | 0.1566 | 0.7300 |
All transfer documents specified in 310 CMR 7.24(7)(e)2.
310 CMR, § 7.24