310 CMR, § 15.204

Current through Register 1529, August 30, 2024
Section 15.204 - Increases in Design Flow to System

No person shall increase the actual or design flow to any cesspool or to any other system above the existing approved capacity, or change the type of establishment of a facility served by a cesspool, unless the cesspool or system is upgraded first. Upgrades to accept increased design flow shall be performed in full compliance with the requirements applicable to new construction unless a variance is allowed pursuant to 310 CMR 15.414. For purposes of 310 CMR 15.204, the approved design flow shall be the flow listed in the most recent Disposal Works Construction Permit.

310 CMR, § 15.204