248 CMR, § 5.03

Current through Register 1536, December 6, 2024
Section 5.03 - Modifications to Chapter 3, Definitions
(1) Replace subsection 3.2.2 with the following:

Authority Having Jurisdiction (AHJ). Inspector as defined in 248 CMR 3.02: Definitions, the Board, or such other authority approved by the Board.

(2) Add to subsection 3.2.4 the following at the end of the subsection:

Listed equipment must meet product acceptance requirements in 248 CMR 3.00: General Provisions Governing the Conduct of Plumbing and Gas Fitting Work Performed in the Commonwealth.

(3) Delete subsection 3.3.85 Qualified Agency
(4) Add to subsection 3.3.102 the following after the word "seal": including pipe dope and pipe thread sealing tape (e.g. Teflon).
(5) Add a new subsection 3.3.112 as follows:

3.3.112 Downstream. Outlet or discharge side of equipment, a fixture, an appurtenance, or other device from which gas, liquid, or other substances exit. This term may also be utilized to describe the direction in which a gas, liquid, or other substance is flowing.

(6) Add a new subsection 3.3.113 as follows:

3.3.113 Upstream. Inlet or supply side of equipment, a fixture, an appurtenance, or other device into which gas, liquid, or other substances flow. This term may also be utilized to describe the direction from which a gas, liquid, or other substance has originated.

248 CMR, § 5.03

Amended by Mass Register Issue 1275, eff. 12/5/2014.