220 CMR, 50, 382

Current through Register 1533, October 25, 2024
Section 382 - Meter Installations
A. This account shall include the cost of labor and materials used, and expenses incurred in connection with the original installation of customer meters.
B. When a meter installation is permanently retired from service, the cost thereof shall be credited to this account.

ITEMS

1. Cocks.
2. Locks.
3. Labor.
4. Meter bars.
5. Pipe and fittings.
6. Seals.
7. Shelves.
8. Swivels and bushings.
9. Transportation.

220 CMR, 50, 382