This account shall include the cost of rights-of-way used in connection with transmission and distribution operations. (See gas plant instruction 6.)
220 CMR, 50, 365.2
This account shall include the cost of rights-of-way used in connection with transmission and distribution operations. (See gas plant instruction 6.)
220 CMR, 50, 365.2