220 CMR, § 112.11

Current through Register 1538, January 3, 2025
Section 112.11 - Plans and Procedures
(1) At each LNG plant, the operator shall prepare, adhere to, and maintain in promptly updated form the plans and procedures required by 220 CMR 112.00 and by 49 CFR Part 193 for that plant. The plans and procedures shall be made available on request by the Department for review and inspection. In addition, each change to the plans or procedures shall be available at the LNG plant for review and inspection within 20 days after the change is made.
(2) Each operator shall timely submit the plans and procedures and any changes thereto to the Department, except for security plans and procedures subject to the provisions of 220 CMR 69.02.
(3) The Department may require the operator to amend its plans and procedures to provide a reasonable level of safety.

220 CMR, § 112.11

Amended by Mass Register Issue 1432, eff. 12/11/2020.