205 Mass. Reg. 122.03

Current through Register 1523, June 7, 2024
Section 122.03 - Costs Included in the Calculation of Capital Investment

For purposes of calculating the capital investment for a category 1 or category 2 gaming license, the following costs shall be included:

(1) Costs related to the actual construction of the gaming establishment and site including any hotels, gaming areas, and other amenities, including overhead and indirect costs attributable to the construction activities.
(2) Costs related to preparation of the site including, clearing, demolition and abatement.
(3) Costs related to the design of the project, including building design, interior design, and exterior site design.
(4) Costs associated with consulting and due-diligence necessary to fund studies and devise engineering solutions in accordance with M.G.L. c. 23K including traffic studies, environmental studies, and other associated mitigation studies.
(5) Costs associated with minimizing the environmental impact of the project including upfront costs aimed at minimizing a carbon footprint or implementing sustainable elements and/or smart growth practices.
(6) Costs associated with designing, improving or constructing the infrastructure inside the property boundaries of the site of the gaming establishment including those related to drainage, utility support, roadways, interchanges, fill and soil or groundwater or surface water contamination issues, sewer, storm water, landscaping, and public transportation. Provided, however, in accordance with M.G.L. c. 23K, § 11(a), that any infrastructure improvements necessary to increase visitor capacity and account for traffic mitigation for a category 2 gaming establishment shall not be considered as part of the capital investment in a category 2 gaming establishment license application.
(7) Costs associated with the pre-opening purchase of fixtures, equipment, gaming equipment, information technology equipment, and personal property to be used within the gaming establishment and site including those within hotels, restaurants, retail and other service businesses associated with the establishment.
(8) Costs associated with applying for federal, state, or municipal permits.
(9) Professional and management fees including for engineers, architects, developers, contractors, or operators to the extent that they represent indirect and overhead costs related to the development of the project, and do not represent profits or payout as part of partnership agreements or "home office" overhead (i.e., out of state).
(10) Costs associated with the safety, training, quality assurance, or testing incurred during the construction of the gaming establishment and site.
(11) (For Region C applicants) Capitalized interest.
(12) (For Region C applicants) Costs associated with designing, improving or constructing the infrastructure outside the property boundaries of the site of the gaming establishment including those related to drainage, utility support, roadways, interchanges, fill and soil or groundwater or surface water contamination issues, sewer, storm water, landscaping, and public transportation whether or not such costs are the result of a host community agreement, a surrounding community agreement, required by any regulatory body or as part of the permitting process.

205 CMR 122.03

Amended by Mass Register Issue 1286, eff. 8/8/2014.